Data Centers in Durham County, NC

5 data centers are mapped in Durham County, North Carolina: 5 buildings covering about 8.1 acres (351,000 sq ft) of roof. Operators include CyrusOne, Duke Libraries. The county is in EPA's Virginia/Carolinas grid region, whose electricity is 40% nuclear, 39% natural gas and 10% coal, at 590 lb of CO₂ per megawatt-hour.

Sites5mapped data centers
Buildings5mapped footprints
Roof area8.1 acbuilding footprints
GridDuke Energy Carolinaslargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Durham County

Data centerOperatorCityRoof area
DUR1CyrusOneDurham6.2 ac
DUR2CyrusOneDurham1.9 ac
Windstream CommunicationsOperator not recordedDurham—
Level 3 CommunicationsOperator not recordedDurham—
Brandaleone Lab for Data and VisualizationDuke LibrariesDurham—

What the grid here generates

Data centers in Durham County draw from the regional grid. In 2023, electricity in EPA's Virginia/Carolinas region was 40% nuclear, 39% natural gas, 10% coal and 6% solar, at 590 lb of CO₂ per megawatt-hour, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Durham County

UtilityTypeGridBusiness rateIndustrial rate
Duke Energy Carolinas, LLCInvestor OwnedDuke Energy Carolinas9.9¢7.8¢
Duke Energy Progress - (NC)Investor OwnedDuke Energy Progress East11.3¢7.9¢
Wake Electric Membership CorpCooperativeDuke Energy Progress East11.1¢4.7¢
Piedmont Electric Member CorpCooperativeDuke Energy Carolinas14.3¢9.3¢

Utilities that report serving Durham County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Durham County

PlantFuelCapacity
Mile FarmSolar5.0 MW
Star SolarSolar5.0 MW
Durham SolarSolar3.5 MW
XPF Solar FieldSolar3.0 MW
Mas Durham Power, LLCBiomass2.2 MW

All power plants in Durham County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me