22 data centers mapped in North Carolina: 26 buildings covering about 80 acres of roof. The most are in Durham County (5). Most sit in EPA's Virginia/Carolinas grid region, whose electricity is 40% nuclear, 39% natural gas and 10% coal, at 590 lb of CO₂ per megawatt-hour, 23% cleaner than the U.S. grid as a whole (765 lb).
Data centerUnder construction
A data center draws from its regional grid, not from one plant. These are the grid regions North Carolina's data centers sit in, and what those regions generate:
590 lb CO₂ per MWh, 23% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.
Flexential (3) · CyrusOne (2) · DartPoints (1) · Duke Libraries (1) · Meta (1) · TierPoint (1)
| Data center | City · County | Roof area |
|---|---|---|
| Meta data center, Forest City | Forest City · Rutherford | 20 ac |
| Data center, Newton | Newton · Catawba | 18 ac |
| Data center, Lenoir | Lenoir · Caldwell | 15 ac |
| DUR1 | Durham · Durham | 6.2 ac |
| Data center, Newton | Newton · Catawba | 4.6 ac |
| Data center, Lenoir | Lenoir · Caldwell | 3.4 ac |
| BB&T Data Center | Zebulon · Wake | 3.3 ac |
| Spectrum Charlotte National Data Center | Charlotte · Mecklenburg | 2.1 ac |
| DUR2 | Durham · Durham | 1.9 ac |
| Flexential Charlotte - North | Charlotte · Mecklenburg | 1.4 ac |
| TierPoint - Charlotte Data Center | Charlotte · Mecklenburg | 1.4 ac |
| Segra Data Center | Raleigh · Wake | 1.1 ac |
| Flexential Charlotte - South | Charlotte · Mecklenburg | 0.8 ac |
| SEGRA | Charlotte · Mecklenburg | 0.4 ac |
| iGLASS Networks | Cary · Wake | 0.2 ac |
| DartPoints Asheville | Asheville · Buncombe | — |
| T5 Charlotte Campus | Kings Mountain · Cleveland | — |
| Windstream Communications | Durham · Durham | — |
| Level 3 Communications | Durham · Durham | — |
| Brandaleone Lab for Data and Visualization | Durham · Durham | — |
| Data center, Midland | Midland · Union | — |
| Flexential Raleigh | Morrisville · Wake | — |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.