BB&T Data Center is a data center in Zebulon, Wake County, North Carolina. It is mapped as 1 building covering about 3.3 acres (142,000 sq ft). Its power comes off the Virginia/Carolinas grid (Duke Energy Carolinas), which runs on 40% nuclear, 39% natural gas and 10% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | Wake County, North Carolina |
|---|---|
| Coordinates | 35.83938, -78.32822 |
| On OpenStreetMap | way/830138727 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the Duke Energy Carolinas grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.
Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Duke Energy Carolinas, LLC | 9.9¢ | 7.8¢ |
| Duke Energy Progress - (NC) | 11.3¢ | 7.9¢ |
| Wake Electric Membership Corp | 11.1¢ | 4.7¢ |
| Town of Apex- (NC) | 14.0¢ | — |
Utilities that report serving Wake County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Wakefield Solar | Solar | 5.0 MW | 1.9 mi |
| Nash 97 Solar 2 | Solar | 4.9 MW | 6.5 mi |
| Nash 97 Solar, LLC | Solar | 5.2 MW | 6.6 mi |
| Wendell Solar Farm LLC | Solar | 5.0 MW | 7.4 mi |
| Knightdale Battery | Battery Storage | 100 MW | 8.1 mi |
| Progress Solar 1, LLC | Solar | 4.0 MW | 8.7 mi |
| Truman (NC) | Solar | 5.0 MW | 8.7 mi |
| Spring Hope Solar 2, LLC | Solar | 5.0 MW | 8.9 mi |
| Spring Hope Solar 3, LLC | Solar | 5.0 MW | 8.9 mi |
| Chei Solar | Solar | 5.0 MW | 8.9 mi |
The largest power plant within 50 miles is Lee Combined Cycle Plant, a 1,068 MW natural gas plant 35 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
Data centers in North Carolina · Data centers in Wake County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.