Spring Hope Solar 2, LLC is a solar power plant in North Carolina with a nameplate capacity of 5.0 MW. It generates roughly 9.2k MWh per year — enough to power about 874 average U.S. homes.
Its capacity factor of 21% reflects intermittent or peaking operation.
Run flat out every hour of the year, Spring Hope Solar 2, LLC could make 43.8k MWh. In 2023 it made 9.2k MWh — the same as running at full power 21 hours in every 100.
Peaking or variableCapacity factor 21%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 689 Frazier Rd |
|---|---|
| City | Spring Hope |
| County | Nash County |
| State | North Carolina |
| ZIP | 27882 |
| Coordinates | 35.90708, -78.19376 |
| Operator | Spring Hope Solar 2, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 68900 | Solar Photovoltaic | Solar | 5.0 MW | Operating | 2021 |
| Owner | Location | Share |
|---|---|---|
| Morpho Ventures III, LLC | El Segundo, CA | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | SERC |
|---|---|
| Balancing Authority | Duke Energy Carolinas |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| BB&T Data Center | 8.9 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map