Electric generating plantEIA plant no. 60408

Nash 97 Solar, LLC

Type
Solar Photovoltaic
Nameplate capacity
5.2 MW
Units
1
In service since
2016
Operator
Cypress Creek Renewables
Location
Middlesex, Nash County, North Carolina
Rated 205th largest in North Carolina · 7414th of 14,761 in the U.S. · by nameplate

Nash 97 Solar, LLC is a solar power plant in North Carolina with a nameplate capacity of 5.2 MW. It generates roughly 9.2k MWh per year — enough to power about 876 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Nash 97 Solar, LLC could make 45.6k MWh. In 2023 it made 9.2k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year45.6k MWh5.2 MW × 8,760 hours
Actually generated9.2k MWhEPA eGRID, 2023 · ≈876 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBattery Storage

Location

Address11250 North Carolina 97
CityMiddlesex
CountyNash County
StateNorth Carolina
ZIP27557
Coordinates35.84927, -78.21152
OperatorCypress Creek Renewables

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
97PVSolar PhotovoltaicSolar5.2 MWOperating2016

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Carolinas

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Nash County

View all plants in Nash County →

Data centers near Nash 97 Solar, LLC

Data centerOperatorDistance
BB&T Data CenterNot recorded6.6 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more