Flexential Charlotte - South

Flexential Charlotte - South is a data center in Charlotte, Mecklenburg County, North Carolina. It is mapped as 1 building covering about 33,600 sq ft. Its power comes off the Virginia/Carolinas grid (Duke Energy Carolinas), which runs on 40% nuclear, 39% natural gas and 10% coal.

OperatorFlexentialas mapped
Roof area0.8 ac1 building
Grid CO₂590 lbper MWh, SRVC region
Nearest plant5.1 miPineville Delivery 2

Location

This data centerOther data centersPower plants (colored by fuel)

Address8910 Lenox Pointe Drive, Charlotte NC 28272
CountyMecklenburg County, North Carolina
Coordinates35.13536, -80.93687
Websitewww.flexential.com/data-centers/nc/charlotte/south-data-cen…
On OpenStreetMapway/215630401

What powers Flexential Charlotte - South

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the Duke Energy Carolinas grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.

Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Mecklenburg County

UtilityTypeGridBusiness rateIndustrial rate
Duke Energy Carolinas, LLCInvestor OwnedDuke Energy Carolinas9.9¢7.8¢
EnergyUnited Elec Member CorpCooperativeDuke Energy Carolinas9.8¢5.8¢
Union Electric Membership Corp - (NC)CooperativeDuke Energy Carolinas10.9¢5.5¢
Town of Huntersville - (NC)MunicipalDuke Energy Carolinas10.2¢6.7¢
York Electric Coop IncCooperativeDuke Energy Carolinas11.9¢—

Utilities that report serving Mecklenburg County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Pineville Delivery 2Oil1.8 MW5.1 mi
Allen 1 Battery Energy Storage SystemBattery Storage50.0 MW6.4 mi
WylieHydroelectric60.0 MW8.8 mi
CatawbaNuclear2,410 MW9.5 mi
Orbit Energy CharlotteBiomass5.2 MW11.3 mi
Reventure ParkBiomass3.5 MW11.5 mi
Mountain IslandHydroelectric60.0 MW14.0 mi
Gaston Memorial HospitalOil1.8 MW14.9 mi
Gastonia Solar CenterSolar4.3 MW15.6 mi
Auten Road Farm, LLCSolar5.0 MW16.3 mi

The largest power plant within 50 miles is McGuire, a 2,441 MW nuclear plant 21 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Spectrum Charlotte National Data CenterOperator not recorded2.1 ac1.3 mi
TierPoint - Charlotte Data CenterTierPoint1.4 ac2.7 mi
SEGRAOperator not recorded0.4 ac3.1 mi

More

Data centers in North Carolina · Data centers in Mecklenburg County · All Flexential data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me