Data Centers in Caldwell County, NC

2 data centers are mapped in Caldwell County, North Carolina: 2 buildings covering about 18.1 acres (788,000 sq ft) of roof. The county is in EPA's Virginia/Carolinas grid region, whose electricity is 40% nuclear, 39% natural gas and 10% coal, at 590 lb of CO₂ per megawatt-hour.

Sites2mapped data centers
Buildings2mapped footprints
Roof area18 acbuilding footprints
GridDuke Energy Carolinaslargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Caldwell County

Data centerOperatorCityRoof area
Data center, LenoirOperator not recordedLenoir15 ac
Data center, LenoirOperator not recordedLenoir3.4 ac

What the grid here generates

Data centers in Caldwell County draw from the regional grid. In 2023, electricity in EPA's Virginia/Carolinas region was 40% nuclear, 39% natural gas, 10% coal and 6% solar, at 590 lb of CO₂ per megawatt-hour, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Caldwell County

UtilityTypeGridBusiness rateIndustrial rate
Duke Energy Carolinas, LLCInvestor OwnedDuke Energy Carolinas9.9¢7.8¢
EnergyUnited Elec Member CorpCooperativeDuke Energy Carolinas9.8¢5.8¢
Blue Ridge Elec Member Corp - (NC)CooperativeDuke Energy Carolinas12.4¢7.4¢
Rutherford Elec Member CorpCooperativeDuke Energy Carolinas12.6¢8.0¢

Utilities that report serving Caldwell County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Caldwell County

PlantFuelCapacity
RhodhissHydroelectric25.5 MW
Brighter Future SolarSolar11.0 MW
Granite Falls WalmartOil2.2 MW
Bernhardt Furniture Solar FarmSolar1.1 MW

All power plants in Caldwell County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me