Data Centers in Franklin County, OH

18 data centers are mapped in Franklin County, Ohio: 34 buildings covering about 110 acres (4,781,000 sq ft) of roof. Operators include Amazon Web Services, Google, Cologix, Amazon Web Services us-east-2 datacenter. The county is in EPA's Ohio Valley grid region, whose electricity is 38% natural gas, 28% nuclear and 25% coal, at 911 lb of CO₂ per megawatt-hour.

Sites18mapped data centers
Buildings34mapped footprints
Roof area110 acbuilding footprints
GridPJM Interconnectionlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Franklin County

Data centerOperatorCityRoof area
Amazon Web Services data center, DublinAmazon Web ServicesDublin22 ac
Amazon Web Services data center, AmlinAmazon Web ServicesAmlin20 ac
Amazon Web Services data center, HilliardAmazon Web ServicesHilliard18 ac
Amazon Web Services data center, HilliardAmazon Web ServicesHilliard9.8 ac
Data center, HilliardOperator not recordedHilliard8.9 ac
Google data center, LockbourneGoogleLockbourne6.6 ac
Google NBY-5GoogleNew Albany6.6 ac
Google NBY-4GoogleNew Albany6.5 ac
TJX Corporate TechnoOperator not recordedNew Albany2.3 ac
Cologix COL2CologixColumbus2.3 ac
Oppidan data center, HilliardOppidanHilliard2.0 ac
Cologix COL4CologixColumbus2.0 ac
Compugen New AlbanyOperator not recordedNew Albany1.8 ac
Cologix COL1CologixColumbus1.3 ac
DartPoints DublinDartPoints43017—
Amazon AWS: Hilliard Data CenterAmazon Web Services us-east-2 datacenterHilliard—
STACK New AlbanyOperator not recordedNew Albany—
Google Lockbourne, OHGoogleLockbourne—

What the grid here generates

Data centers in Franklin County draw from the regional grid. In 2023, electricity in EPA's Ohio Valley region was 38% natural gas, 28% nuclear, 25% coal and 5% wind, at 911 lb of CO₂ per megawatt-hour, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Franklin County

UtilityTypeGridBusiness rateIndustrial rate
Ohio Power CoInvestor OwnedPJM Interconnection16.5¢15.2¢
Ohio Edison CoInvestor OwnedPJM Interconnection17.2¢13.2¢
Duke Energy Ohio IncInvestor OwnedPJM Interconnection11.6¢8.7¢
South Central Power CompanyCooperativePJM Interconnection13.6¢10.8¢
Licking Rural Electric IncCooperativePJM Interconnection17.5¢13.4¢
City of Columbus - (OH)MunicipalPJM Interconnection13.8¢10.3¢
Consolidated CooperativeCooperativePJM Interconnection14.8¢11.6¢
City of Westerville - (OH)MunicipalPJM Interconnection12.0¢9.6¢

Utilities that report serving Franklin County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Franklin County

PlantFuelCapacity
Tosoh SMDNatural Gas3.5 MW
Renick Run Pumping Station 03-04Oil2.8 MW
Jackson Pike WWTP Cogen EnginesBiomass2.8 MW
PS ST-8 Engine No 1Oil2.0 MW
Dodge Park Engine No 1Oil2.0 MW
ST-1/1A Engine No 1Oil1.3 MW
3100 Valleyview DriveSolar1.0 MW

All power plants in Franklin County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me