Vantage Data Centers

7 Vantage data centers are mapped in the U.S. on OpenStreetMap, in 3 states: 8 buildings covering about 31.8 acres (1,386,000 sq ft) of roof. Weighted by building size, the grids they sit on average 748 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Sites7mapped
States3with a site
Buildings8mapped footprints
Roof area32 acbuilding footprints

Map of Vantage data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Ohio Valley391138% natural gas, 28% nuclear and 25% coal
Northwest363139% hydroelectric, 25% natural gas and 16% coal
California142643% natural gas, 20% solar and 14% hydroelectric

Every mapped site

Data centerPlaceGrid regionRoof area
Vantage data center, Santa ClaraSanta Clara, CaliforniaCalifornia3.8 ac
Vantage Building 1New Albany, OhioOhio Valley5.6 ac
Vantage Building 2New Albany, OhioOhio Valley5.4 ac
Vantage Building 3New Albany, OhioOhio Valley5.1 ac
Vantage WA13Quincy, WashingtonNorthwest5.7 ac
Vantage WA11Quincy, WashingtonNorthwest3.4 ac
Vantage WA12Quincy, WashingtonNorthwest2.8 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me