Vantage WA11

Vantage WA11 is a data center in Quincy, Grant County, Washington. It is mapped as 1 building covering about 3.4 acres (146,000 sq ft). Its power comes off the Northwest grid (Avista Corporation), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorVantageas mapped
Roof area3.4 ac1 building
Grid CO₂631 lbper MWh, NWPP region
Nearest plant14.6 miRock Island

Location

This data centerOther data centersPower plants (colored by fuel)

CountyGrant County, Washington
Coordinates47.25033, -119.81455
On OpenStreetMapway/337127817

What powers Vantage WA11

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Avista Corporation grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Grant County

UtilityTypeGridBusiness rateIndustrial rate
Avista CorpInvestor OwnedAvista Corporation12.8¢7.8¢
PUD No 2 of Grant CountyPolitical SubdivisionPublic Utility District No. 2 of Grant County, Washington4.4¢4.0¢
Big Bend Electric Coop, IncCooperativeBonneville Power Administration8.3¢6.7¢
Bonneville Power AdministrationFederalBonneville Power Administration4.5¢1.3¢

Utilities that report serving Grant County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Rock IslandHydroelectric629 MW14.6 mi
Wild HorseWind273 MW23.6 mi
Vantage Wind Energy LLCWind90.0 MW26.8 mi
WanapumHydroelectric1,220 MW27.1 mi
Rocky ReachHydroelectric1,349 MW29.8 mi
Summer Falls Power PlantHydroelectric92.0 MW30.0 mi
Main Canal HeadworksHydroelectric26.8 MW34.9 mi
Penstemon Solar ProjectSolar5.0 MW38.4 mi
Camas Solar ProjectSolar5.0 MW38.4 mi
ChelanHydroelectric59.2 MW41.4 mi

The largest power plant within 50 miles is Rocky Reach, a 1,349 MW hydroelectric plant 30 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Vantage WA13Vantage5.7 ac0.2 mi
Vantage WA12Vantage2.8 ac0.3 mi
Data center, QuincyOperator not recorded15 ac0.3 mi
Data center, QuincyOperator not recorded5.6 ac0.3 mi
Data center, QuincyOperator not recorded6.4 ac0.4 mi
Data center, QuincyOperator not recorded10 ac0.7 mi
Data center, QuincyOperator not recorded2.8 ac2.2 mi
Data center, QuincyOperator not recorded13 ac2.4 mi
NTT Data QuincyNTT5.0 ac2.5 mi
Microsoft data center, QuincyMicrosoft26 ac3.4 mi
Data center, QuincyOperator not recorded4.9 ac3.9 mi

More

Data centers in Washington · Data centers in Grant County · All Vantage data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me