Electric generating plantEIA plant no. 62071

Camas Solar Project

Type
Solar Photovoltaic
Nameplate capacity
5.0 MW
Units
1
In service since
2022
Operator
Altus Power America Management, LLC
Location
Ellensburg, Kittitas County, Washington
Rated 112th largest in Washington · 7466th of 14,761 in the U.S. · by nameplate

Camas Solar Project is a solar power plant in Washington with a nameplate capacity of 5.0 MW. It generates roughly 10.3k MWh per year — enough to power about 981 average U.S. homes.

Its capacity factor of 24% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Camas Solar Project could make 43.8k MWh. In 2023 it made 10.3k MWh — the same as running at full power 24 hours in every 100.

Nameplate, full year43.8k MWh5.0 MW × 8,760 hours
Actually generated10.3k MWhEPA eGRID, 2023 · ≈981 homes

Peaking or variableCapacity factor 24%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWindSolar

Location

Address4561 No 6 Road
CityEllensburg
CountyKittitas County
StateWashington
ZIP98926
Coordinates46.95931, -120.50905
OperatorAltus Power America Management, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
CAMASSolar PhotovoltaicSolar5.0 MWOperating2022

Grid context

NERC RegionWECC
Balancing AuthorityPuget Sound Energy

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.