Urtica Solar Project is a solar power plant in Washington with a nameplate capacity of 5.0 MW. It generates roughly 11.4k MWh per year — enough to power about 1,084 average U.S. homes.
Its capacity factor of 26% reflects intermittent or peaking operation.
Run flat out every hour of the year, Urtica Solar Project could make 43.8k MWh. In 2023 it made 11.4k MWh — the same as running at full power 26 hours in every 100.
Peaking or variableCapacity factor 26%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 751 Manastash Road |
|---|---|
| City | Ellensburg |
| County | Kittitas County |
| State | Washington |
| ZIP | 98926 |
| Coordinates | 47.10754, -120.68974 |
| Operator | Altus Power America Management, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| URTIC | Solar Photovoltaic | Solar | 5.0 MW | Operating | 2022 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Puget Sound Energy |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.