47 data centers mapped in Washington: 71 buildings covering about 165 acres of roof. The most are in King County (15). Most sit in EPA's Northwest grid region, whose electricity is 39% hydroelectric, 25% natural gas and 16% coal, at 631 lb of CO₂ per megawatt-hour, 18% cleaner than the U.S. grid as a whole (765 lb).
Data centerUnder construction
A data center draws from its regional grid, not from one plant. These are the grid regions Washington's data centers sit in, and what those regions generate:
631 lb CO₂ per MWh, 18% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.
Sabey Data Centers (9) · Microsoft (4) · Vantage (3) · Digital Realty (2) · 4421.io (1) · Actapio (1) · CSS Communications (1) · Centersquare (1) · Comcast (1) · Equinix (1) · H5 Data Centers (1) · Iron Mountain (1) · Lumen Technologies (1) · NTT (1) · TierPoint (1) · Unity Cable System (1)
| Data center | City · County | Roof area |
|---|---|---|
| Microsoft data center, Quincy | Quincy · Grant | 26 ac |
| Data center, Quincy | Quincy · Grant | 15 ac |
| Data center, Quincy | Quincy · Grant | 13 ac |
| Data center, Quincy | Quincy · Grant | 10 ac |
| Data center, Quincy | Quincy · Grant | 6.4 ac |
| Intergate Columbia A | East Wenatchee · Douglas | 6.0 ac |
| Vantage WA13 | Quincy · Grant | 5.7 ac |
| Data center, Quincy | Quincy · Grant | 5.6 ac |
| Microsoft EAT02 | East Wenatchee · Douglas | 5.6 ac |
| Microsoft EAT03 | East Wenatchee · Douglas | 5.4 ac |
| Microsoft EAT04 under construction | East Wenatchee · Douglas | 5.4 ac |
| NTT Data Quincy | Quincy · Grant | 5.0 ac |
| Data center, Quincy | Quincy · Grant | 4.9 ac |
| Intergate Seattle East Building 3 | Tukwila · King | 4.6 ac |
| Intergate Seattle East Building 5 | Tukwila · King | 4.6 ac |
| Intergate Columbia B | East Wenatchee · Douglas | 4.4 ac |
| Vantage WA11 | Quincy · Grant | 3.4 ac |
| Intergate Columbia D | Rock Island · Douglas | 3.1 ac |
| Vantage WA12 | Quincy · Grant | 2.8 ac |
| Data center, Quincy | Quincy · Grant | 2.8 ac |
| Intergate Seattle East Building 4 | Tukwila · King | 2.7 ac |
| Centeris SH1 Colocation | Puyallup · Pierce | 2.6 ac |
| Intergate Seattle East Building 2 | Tukwila · King | 2.4 ac |
| Centersquare Lynnwood SE1 | Lynnwood · Snohomish | 2.4 ac |
| Actapio data center, East Wenatchee | East Wenatchee · Douglas | 2.3 ac |
| Intergate Seattle East Building 1 | Seattle · King | 2.2 ac |
| Centeris SH2 Build-to-Suit | Puyallup · Pierce | 2.1 ac |
| The Seattle Times | Seattle · King | 1.1 ac |
| KOMO Plaza East | Seattle · King | 1.0 ac |
| Intergate Seattle West Building A | Tukwila · King | 0.9 ac |
| Data center, Malaga | Malaga · Douglas | 0.7 ac |
| Lumen | Spokane · Spokane | 0.6 ac |
| Digital Fortress Lynnwood | Lynnwood · Snohomish | 0.6 ac |
| CTI Biopharma | Seattle · King | 0.5 ac |
| KOMO Plaza West | Seattle · King | 0.5 ac |
| Intergate Seattle West Building C | Tukwila · King | 0.5 ac |
| Intergate Seattle West Building B | Tukwila · King | 0.4 ac |
| TierPoint data center, Liberty Lake | Liberty Lake · Spokane | 0.3 ac |
| Iron Mountain data center, Spokane | Spokane · Spokane | 0.3 ac |
| Westin Building | Seattle · King | 0.3 ac |
| Equinix SE3 Data Center | Seattle · King | 0.3 ac |
| Comcast data center, Seattle | Seattle · King | 0.2 ac |
| CSSNW Bellingham | Bellingham · Whatcom | 0.1 ac |
| Norma Beach Cable Landing Station | Lynnwood · Snohomish | 0.1 ac |
| Intergate Columbia | Rock Island · Douglas | — |
| Centeris | Puyallup · Pierce | — |
| 4421.io data center, Everett | Everett · Snohomish | — |
1 site is tagged as under construction.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.