Data center, Malaga

Data center, Malaga is a data center in Malaga, Douglas County, Washington. It is mapped as 4 buildings covering about 29,400 sq ft. Its power comes off the Northwest grid (Public Utility District No. 2 of Grant County, Washington), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorOperator not recordedas mapped
Roof area0.7 ac4 buildings
Grid CO₂631 lbper MWh, NWPP region
Nearest plant6.7 miRock Island

Location

This data centerOther data centersPower plants (colored by fuel)

CountyDouglas County, Washington
Coordinates47.39196, -120.21745
On OpenStreetMapway/814061068, way/814061069, way/814061070, way/814061071

What powers Data center, Malaga

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Public Utility District No. 2 of Grant County, Washington grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Douglas County

UtilityTypeGridBusiness rateIndustrial rate
PUD No 2 of Grant CountyPolitical SubdivisionPublic Utility District No. 2 of Grant County, Washington4.4¢4.0¢
PUD No 1 of Douglas CountyPolitical SubdivisionPUD No. 1 of Douglas County3.9¢2.9¢
Bonneville Power AdministrationFederalBonneville Power Administration4.5¢1.3¢

Utilities that report serving Douglas County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Rock IslandHydroelectric629 MW6.7 mi
Rocky ReachHydroelectric1,349 MW10.4 mi
Wild HorseWind273 MW24.6 mi
Sagebrush Power PartnersWind101 MW28.3 mi
Urtica Solar ProjectSolar5.0 MW29.6 mi
Vantage Wind Energy LLCWind90.0 MW30.3 mi
Swauk Wind LLCWind4.3 MW30.6 mi
ChelanHydroelectric59.2 MW32.0 mi
Penstemon Solar ProjectSolar5.0 MW32.9 mi
Camas Solar ProjectSolar5.0 MW32.9 mi

The largest power plant within 50 miles is Chief Joseph, a 2,456 MW hydroelectric plant 50 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Actapio data center, East WenatcheeActapio2.3 ac1.1 mi
Intergate Columbia DSabey Data Centers3.1 ac1.6 mi
Intergate ColumbiaOperator not recorded—1.7 mi
Intergate Columbia ASabey Data Centers6.0 ac1.7 mi
Intergate Columbia BSabey Data Centers4.4 ac1.7 mi
Microsoft EAT02Microsoft5.6 ac1.8 mi
Microsoft EAT03Microsoft5.4 ac1.9 mi
Microsoft EAT04 under constructionMicrosoft5.4 ac1.9 mi

More

Data centers in Washington · Data centers in Douglas County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me