Actapio data center, East Wenatchee is a data center in East Wenatchee, Douglas County, Washington. It is mapped as 1 building covering about 2.3 acres (101,000 sq ft). Its power comes off the Northwest grid (Public Utility District No. 2 of Grant County, Washington), which runs on 39% hydroelectric, 25% natural gas and 16% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 207 North United Sakura Drive, East Wenatchee WA 98802 |
|---|---|
| County | Douglas County, Washington |
| Coordinates | 47.40765, -120.21463 |
| Website | www.actap.io/ |
| On OpenStreetMap | way/813688320, way/813688319 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Public Utility District No. 2 of Grant County, Washington grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.
Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| PUD No 2 of Grant County | 4.4¢ | 4.0¢ |
| PUD No 1 of Douglas County | 3.9¢ | 2.9¢ |
| Bonneville Power Administration | 4.5¢ | 1.3¢ |
Utilities that report serving Douglas County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Rock Island | Hydroelectric | 629 MW | 7.2 mi |
| Rocky Reach | Hydroelectric | 1,349 MW | 9.5 mi |
| Wild Horse | Wind | 273 MW | 25.7 mi |
| Sagebrush Power Partners | Wind | 101 MW | 29.1 mi |
| Urtica Solar Project | Solar | 5.0 MW | 30.4 mi |
| Chelan | Hydroelectric | 59.2 MW | 31.0 mi |
| Swauk Wind LLC | Wind | 4.3 MW | 31.3 mi |
| Vantage Wind Energy LLC | Wind | 90.0 MW | 31.3 mi |
| Penstemon Solar Project | Solar | 5.0 MW | 33.9 mi |
| Camas Solar Project | Solar | 5.0 MW | 33.9 mi |
The largest power plant within 50 miles is Chief Joseph, a 2,456 MW hydroelectric plant 49 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Microsoft EAT02 | 5.6 ac | 0.7 mi |
| Microsoft EAT03 | 5.4 ac | 0.8 mi |
| Microsoft EAT04 under construction | 5.4 ac | 0.8 mi |
| Intergate Columbia D | 3.1 ac | 1.1 mi |
| Data center, Malaga | 0.7 ac | 1.1 mi |
| Intergate Columbia | — | 1.1 mi |
| Intergate Columbia A | 6.0 ac | 1.2 mi |
| Intergate Columbia B | 4.4 ac | 1.3 mi |
Data centers in Washington · Data centers in Douglas County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.