Data Centers in Douglas County, WA

9 data centers are mapped in Douglas County, Washington: 12 buildings covering about 32.8 acres (1,427,000 sq ft) of roof. Operators include Microsoft, Sabey Data Centers, Actapio. The county is in EPA's Northwest grid region, whose electricity is 39% hydroelectric, 25% natural gas and 16% coal, at 631 lb of CO₂ per megawatt-hour.

Sites9mapped data centers
Buildings12mapped footprints
Roof area33 acbuilding footprints
GridPublic Utility District No. 2 of Grant County, Washingtonlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Douglas County

Data centerOperatorCityRoof area
Intergate Columbia ASabey Data CentersEast Wenatchee6.0 ac
Microsoft EAT02MicrosoftEast Wenatchee5.6 ac
Microsoft EAT03MicrosoftEast Wenatchee5.4 ac
Microsoft EAT04 under constructionMicrosoftEast Wenatchee5.4 ac
Intergate Columbia BSabey Data CentersEast Wenatchee4.4 ac
Intergate Columbia DSabey Data CentersRock Island3.1 ac
Actapio data center, East WenatcheeActapioEast Wenatchee2.3 ac
Data center, MalagaOperator not recordedMalaga0.7 ac
Intergate ColumbiaOperator not recordedRock Island—

What the grid here generates

Data centers in Douglas County draw from the regional grid. In 2023, electricity in EPA's Northwest region was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind, at 631 lb of CO₂ per megawatt-hour, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Douglas County

UtilityTypeGridBusiness rateIndustrial rate
PUD No 2 of Grant CountyPolitical SubdivisionPublic Utility District No. 2 of Grant County, Washington4.4¢4.0¢
PUD No 1 of Douglas CountyPolitical SubdivisionPUD No. 1 of Douglas County3.9¢2.9¢
Bonneville Power AdministrationFederalBonneville Power Administration4.5¢1.3¢

Utilities that report serving Douglas County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Douglas County

PlantFuelCapacity
Chief JosephHydroelectric2,456 MW

All power plants in Douglas County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me