Data Centers in King County, WA

15 data centers are mapped in King County, Washington: 15 buildings covering about 22.1 acres (965,000 sq ft) of roof. Operators include Sabey Data Centers, Digital Realty, Comcast, Equinix. The county is in EPA's Northwest grid region, whose electricity is 39% hydroelectric, 25% natural gas and 16% coal, at 631 lb of CO₂ per megawatt-hour.

Sites15mapped data centers
Buildings15mapped footprints
Roof area22 acbuilding footprints
GridPuget Sound Energylargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in King County

Data centerOperatorCityRoof area
Intergate Seattle East Building 3Sabey Data CentersTukwila4.6 ac
Intergate Seattle East Building 5Sabey Data CentersTukwila4.6 ac
Intergate Seattle East Building 4Digital RealtyTukwila2.7 ac
Intergate Seattle East Building 2Operator not recordedTukwila2.4 ac
Intergate Seattle East Building 1Sabey Data CentersSeattle2.2 ac
The Seattle TimesH5 Data CentersSeattle1.1 ac
KOMO Plaza EastOperator not recordedSeattle1.0 ac
Intergate Seattle West Building ASabey Data CentersTukwila0.9 ac
CTI BiopharmaOperator not recordedSeattle0.5 ac
KOMO Plaza WestOperator not recordedSeattle0.5 ac
Intergate Seattle West Building CSabey Data CentersTukwila0.5 ac
Intergate Seattle West Building BSabey Data CentersTukwila0.4 ac
Westin BuildingDigital RealtySeattle0.3 ac
Equinix SE3 Data CenterEquinixSeattle0.3 ac
Comcast data center, SeattleComcastSeattle0.2 ac

What the grid here generates

Data centers in King County draw from the regional grid. In 2023, electricity in EPA's Northwest region was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind, at 631 lb of CO₂ per megawatt-hour, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve King County

UtilityTypeGridBusiness rateIndustrial rate
Puget Sound Energy IncInvestor OwnedPuget Sound Energy13.7¢12.5¢
City of Seattle - (WA)MunicipalSeattle City Light11.8¢10.1¢
City of Tacoma - (WA)MunicipalCity of Tacoma, Department of Public Utilities, Light Division10.3¢7.7¢
PUD No 1 of Chelan CountyPolitical SubdivisionPublic Utility District No. 1 of Chelan County4.1¢3.4¢
Bonneville Power AdministrationFederalBonneville Power Administration4.5¢1.3¢

Utilities that report serving King County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in King County

PlantFuelCapacity
Snoqualmie 2Hydroelectric38.7 MW
Cedar Falls (WA)Hydroelectric30.0 MW
Twin Falls HydroHydroelectric24.0 MW
South Fork ToltHydroelectric16.8 MW
University of Washington Power PlantNatural Gas15.0 MW
SnoqualmieHydroelectric12.8 MW
Calligan Creek Hydroelectric ProjectHydroelectric6.0 MW
Hancock Creek Hydroelectric ProjectHydroelectric6.0 MW
Cedar HillsBiomass5.4 MW
West Point Treatment PlantBiomass4.6 MW
Weeks FallsHydroelectric4.3 MW
Black CreekHydroelectric3.7 MW

All power plants in King County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me