15 data centers are mapped in King County, Washington: 15 buildings covering about 22.1 acres (965,000 sq ft) of roof. Operators include Sabey Data Centers, Digital Realty, Comcast, Equinix. The county is in EPA's Northwest grid region, whose electricity is 39% hydroelectric, 25% natural gas and 16% coal, at 631 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Intergate Seattle East Building 3 | Tukwila | 4.6 ac |
| Intergate Seattle East Building 5 | Tukwila | 4.6 ac |
| Intergate Seattle East Building 4 | Tukwila | 2.7 ac |
| Intergate Seattle East Building 2 | Tukwila | 2.4 ac |
| Intergate Seattle East Building 1 | Seattle | 2.2 ac |
| The Seattle Times | Seattle | 1.1 ac |
| KOMO Plaza East | Seattle | 1.0 ac |
| Intergate Seattle West Building A | Tukwila | 0.9 ac |
| CTI Biopharma | Seattle | 0.5 ac |
| KOMO Plaza West | Seattle | 0.5 ac |
| Intergate Seattle West Building C | Tukwila | 0.5 ac |
| Intergate Seattle West Building B | Tukwila | 0.4 ac |
| Westin Building | Seattle | 0.3 ac |
| Equinix SE3 Data Center | Seattle | 0.3 ac |
| Comcast data center, Seattle | Seattle | 0.2 ac |
Data centers in King County draw from the regional grid. In 2023, electricity in EPA's Northwest region was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind, at 631 lb of CO₂ per megawatt-hour, 18% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Puget Sound Energy Inc | 13.7¢ | 12.5¢ |
| City of Seattle - (WA) | 11.8¢ | 10.1¢ |
| City of Tacoma - (WA) | 10.3¢ | 7.7¢ |
| PUD No 1 of Chelan County | 4.1¢ | 3.4¢ |
| Bonneville Power Administration | 4.5¢ | 1.3¢ |
Utilities that report serving King County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Snoqualmie 2 | Hydroelectric | 38.7 MW |
| Cedar Falls (WA) | Hydroelectric | 30.0 MW |
| Twin Falls Hydro | Hydroelectric | 24.0 MW |
| South Fork Tolt | Hydroelectric | 16.8 MW |
| University of Washington Power Plant | Natural Gas | 15.0 MW |
| Snoqualmie | Hydroelectric | 12.8 MW |
| Calligan Creek Hydroelectric Project | Hydroelectric | 6.0 MW |
| Hancock Creek Hydroelectric Project | Hydroelectric | 6.0 MW |
| Cedar Hills | Biomass | 5.4 MW |
| West Point Treatment Plant | Biomass | 4.6 MW |
| Weeks Falls | Hydroelectric | 4.3 MW |
| Black Creek | Hydroelectric | 3.7 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.