Intergate Seattle West Building B

Intergate Seattle West Building B is a data center run by Sabey Data Centers in Tukwila, King County, Washington. It is mapped as 1 building covering about 19,000 sq ft. Its power comes off the Northwest grid (Puget Sound Energy), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorSabey Data Centersas mapped
Roof area0.4 ac1 building
Grid CO₂631 lbper MWh, NWPP region
Nearest plant11.1 miUniversity of Washington …

Location

This data centerOther data centersPower plants (colored by fuel)

Address12201 Tukwila International Boulevard, Tukwila WA 98168
CountyKing County, Washington
Coordinates47.49316, -122.29372
On OpenStreetMapway/337126741

What powers Intergate Seattle West Building B

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Puget Sound Energy grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve King County

UtilityTypeGridBusiness rateIndustrial rate
Puget Sound Energy IncInvestor OwnedPuget Sound Energy13.7¢12.5¢
City of Seattle - (WA)MunicipalSeattle City Light11.8¢10.1¢
City of Tacoma - (WA)MunicipalCity of Tacoma, Department of Public Utilities, Light Division10.3¢7.7¢
PUD No 1 of Chelan CountyPolitical SubdivisionPublic Utility District No. 1 of Chelan County4.1¢3.4¢
Bonneville Power AdministrationFederalBonneville Power Administration4.5¢1.3¢

Utilities that report serving King County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
University of Washington Power PlantNatural Gas15.0 MW11.1 mi
Cedar HillsBiomass5.4 MW12.0 mi
West Point Treatment PlantBiomass4.6 MW13.6 mi
Snoqualmie 2Hydroelectric38.7 MW21.4 mi
SnoqualmieHydroelectric12.8 MW21.6 mi
Cedar Falls (WA)Hydroelectric30.0 MW24.4 mi
Black CreekHydroelectric3.7 MW27.5 mi
South Fork ToltHydroelectric16.8 MW27.7 mi
Frederickson Power LPNatural Gas318 MW28.3 mi
Twin Falls HydroHydroelectric24.0 MW28.5 mi

The largest power plant within 50 miles is Frederickson Power LP, a 318 MW natural gas plant 28 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Intergate Seattle West Building CSabey Data Centers0.5 ac0.1 mi
Intergate Seattle West Building ASabey Data Centers0.9 ac0.1 mi
Intergate Seattle East Building 3Sabey Data Centers4.6 ac0.2 mi
Intergate Seattle East Building 2Operator not recorded2.4 ac0.2 mi
Intergate Seattle East Building 5Sabey Data Centers4.6 ac0.2 mi
Intergate Seattle East Building 4Digital Realty2.7 ac0.2 mi
Intergate Seattle East Building 1Sabey Data Centers2.2 ac0.3 mi

More

Data centers in Washington · Data centers in King County · All Sabey Data Centers data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me