Centeris

Centeris is a data center in Puyallup, Pierce County, Washington. Its power comes off the Northwest grid (Puget Sound Energy), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorOperator not recordedas mapped
Grid CO₂631 lbper MWh, NWPP region
Nearest plant6.5 miFrederickson Power LP

Location

This data centerOther data centersPower plants (colored by fuel)

CountyPierce County, Washington
Coordinates47.15917, -122.28011
Websitecenteris.com/home
On OpenStreetMapway/680666647

What powers Centeris

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Puget Sound Energy grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Pierce County

UtilityTypeGridBusiness rateIndustrial rate
Puget Sound Energy IncInvestor OwnedPuget Sound Energy13.7¢12.5¢
City of Tacoma - (WA)MunicipalCity of Tacoma, Department of Public Utilities, Light Division10.3¢7.7¢
PUD No 3 of Mason CountyPolitical SubdivisionBonneville Power Administration10.3¢7.7¢
Peninsula Light CompanyCooperativeBonneville Power Administration7.9¢—
PUD No 1 of Lewis CountyPolitical SubdivisionBonneville Power Administration8.6¢6.4¢
Elmhurst Mutual Power & Light CoCooperativeBonneville Power Administration8.3¢—
Lakeview Light & PowerCooperativeBonneville Power Administration9.4¢8.2¢
Bonneville Power AdministrationFederalBonneville Power Administration4.5¢1.3¢

Utilities that report serving Pierce County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Frederickson Power LPNatural Gas318 MW6.5 mi
FredericksonNatural Gas178 MW6.8 mi
ElectronHydroelectric22.8 MW12.6 mi
LRI LFGTE FacilityBiomass4.5 MW12.7 mi
YelmHydroelectric12.0 MW21.0 mi
LaGrandeHydroelectric64.0 MW22.6 mi
Cedar HillsBiomass5.4 MW23.3 mi
AlderHydroelectric51.0 MW24.8 mi
Skookumchuck Wind FacilityWind136 MW28.0 mi
Cedar Falls (WA)Hydroelectric30.0 MW29.5 mi

The largest power plant within 50 miles is Transalta Centralia Generation, a 730 MW coal plant 39 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Centeris SH2 Build-to-SuitOperator not recorded2.1 ac0.0 mi
Centeris SH1 ColocationOperator not recorded2.6 ac0.1 mi

More

Data centers in Washington · Data centers in Pierce County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me