TierPoint data center, Liberty Lake

TierPoint data center, Liberty Lake is a data center in Liberty Lake, Spokane County, Washington. It is mapped as 1 building covering about 14,300 sq ft. Its power comes off the Northwest grid (Avista Corporation), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorTierPointas mapped
Roof area0.3 ac1 building
Grid CO₂631 lbper MWh, NWPP region
Nearest plant3.0 miBoulder Park

Location

This data centerOther data centersPower plants (colored by fuel)

CountySpokane County, Washington
Coordinates47.67192, -117.09595
On OpenStreetMapway/335468616

What powers TierPoint data center, Liberty Lake

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Avista Corporation grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Spokane County

UtilityTypeGridBusiness rateIndustrial rate
Avista CorpInvestor OwnedAvista Corporation12.8¢7.8¢
Inland Power & Light CompanyCooperativeBonneville Power Administration8.7¢6.5¢
Vera Irrigation District #15Political SubdivisionBonneville Power Administration9.0¢—
Modern Electric Water CompanyCooperativeAvista Corporation7.0¢—
Kootenai Electric CooperativeCooperativeAvista Corporation10.8¢—
Bonneville Power AdministrationFederalBonneville Power Administration4.5¢1.3¢

Utilities that report serving Spokane County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Boulder ParkNatural Gas24.6 MW3.0 mi
Post FallsHydroelectric14.5 MW7.0 mi
Upriver Dam Hydro PlantHydroelectric17.6 MW11.0 mi
Rathdrum Power LLCNatural Gas302 MW11.3 mi
Fighting Creek LFGTE PlantBiomass3.2 MW12.4 mi
Northeast (WA)Natural Gas61.8 MW13.5 mi
RathdrumNatural Gas166 MW14.0 mi
Upper FallsHydroelectric10.0 MW15.1 mi
Monroe StreetHydroelectric14.8 MW15.2 mi
Spokane Waste to EnergyBiomass26.0 MW19.3 mi

The largest power plant within 50 miles is Rathdrum Power LLC, a 302 MW natural gas plant 11 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Washington · Data centers in Spokane County · All TierPoint data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me