Data Centers in Hamilton County, OH

3 data centers are mapped in Hamilton County, Ohio: 3 buildings covering about 42,400 sq ft of roof. Operators include CyrusOne, DartPoints. The county is in EPA's Ohio Valley grid region, whose electricity is 38% natural gas, 28% nuclear and 25% coal, at 911 lb of CO₂ per megawatt-hour.

Sites3mapped data centers
Buildings3mapped footprints
Roof area1.0 acbuilding footprints
GridPJM Interconnectionlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Hamilton County

Data centerOperatorCityRoof area
CyrusOne CIN2CyrusOneCincinnati0.7 ac
Data center, CincinnatiOperator not recordedCincinnati0.3 ac
DartPoints CincinnatiDartPointsCincinnati—

What the grid here generates

Data centers in Hamilton County draw from the regional grid. In 2023, electricity in EPA's Ohio Valley region was 38% natural gas, 28% nuclear, 25% coal and 5% wind, at 911 lb of CO₂ per megawatt-hour, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Hamilton County

UtilityTypeGridBusiness rateIndustrial rate
Duke Energy Ohio IncInvestor OwnedPJM Interconnection11.6¢8.7¢
Butler Rural Electric Coop Inc - (OH)CooperativePJM Interconnection16.3¢12.4¢

Utilities that report serving Hamilton County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Hamilton County

PlantFuelCapacity
Miami FortCoal1,181 MW
Central Utility Plant CincinnatiNatural Gas47.2 MW
East Campus Utility PlantOil6.0 MW
Parking Lot ArraySolar3.7 MW

All power plants in Hamilton County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me