Cologix Jacksonville JAX1 is a data center in Jacksonville, Duval County, Florida. It is mapped as 1 building covering about 30,100 sq ft. Its power comes off the Florida grid (Florida Power & Light), which runs on 75% natural gas, 12% nuclear and 5% solar.
This data centerOther data centersPower plants (colored by fuel)
| County | Duval County, Florida |
|---|---|
| Coordinates | 30.33148, -81.66252 |
| Website | cologix.com/data-centers/jacksonville/jax1/ |
| On OpenStreetMap | way/497151852 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Florida grid region, and the county's largest utility is on the Florida Power & Light grid. In 2023, the region's electricity was 75% natural gas, 12% nuclear, 5% solar and 5% coal.
Each megawatt-hour carried about 782 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Florida grid region (FRCC) in 2023, from eGRID. 250 TWh from 255 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Florida Power & Light Co | 10.8¢ | 8.0¢ |
| JEA | 10.5¢ | 7.9¢ |
| Clay Electric Cooperative, Inc - (FL) | 10.8¢ | 6.7¢ |
| Beaches Energy Services | 13.2¢ | — |
Utilities that report serving Duval County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Baptist Medical Center | Natural Gas | 9.0 MW | 1.2 mi |
| J D Kennedy | Natural Gas | 370 MW | 3.2 mi |
| Seminole Mill | Natural Gas | 30.0 MW | 7.1 mi |
| Anheuser-Busch Jacksonville | Natural Gas | 8.7 MW | 7.2 mi |
| Jax LNG | Natural Gas | 12.6 MW | 7.6 mi |
| Northside Generating Station | Natural Gas | 1,407 MW | 8.8 mi |
| Imeson Solar | Solar | 10.0 MW | 9.2 mi |
| Hecate Energy Blair Road LLC | Solar | 4.0 MW | 10.7 mi |
| IKEA Jacksonville Rooftop PV System | Solar | 1.4 MW | 11.5 mi |
| Starratt Solar | Solar | 5.0 MW | 11.8 mi |
The largest power plant within 50 miles is Seminole (FL), a 1,898 MW coal plant 41 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
Data centers in Florida · Data centers in Duval County · All Cologix data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.