2 data centers are mapped in Duval County, Florida: 2 buildings covering about 30,100 sq ft of roof. Operators include Cologix, Flexential. The county is in EPA's Florida grid region, whose electricity is 75% natural gas, 12% nuclear and 5% solar, at 782 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Cologix Jacksonville JAX1 | Jacksonville | 0.7 ac |
| Flexential Jacksonville | Jacksonville | — |
Data centers in Duval County draw from the regional grid. In 2023, electricity in EPA's Florida region was 75% natural gas, 12% nuclear, 5% solar and 5% coal, at 782 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Florida grid region (FRCC) in 2023, from eGRID. 250 TWh from 255 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Florida Power & Light Co | 10.8¢ | 8.0¢ |
| JEA | 10.5¢ | 7.9¢ |
| Clay Electric Cooperative, Inc - (FL) | 10.8¢ | 6.7¢ |
| Beaches Energy Services | 13.2¢ | — |
Utilities that report serving Duval County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Northside Generating Station | Natural Gas | 1,407 MW |
| Brandy Branch | Natural Gas | 783 MW |
| Greenland Energy Center | Natural Gas | 381 MW |
| J D Kennedy | Natural Gas | 370 MW |
| Seminole Mill | Natural Gas | 30.0 MW |
| Jacksonville Solar | Solar | 12.6 MW |
| Jax LNG | Natural Gas | 12.6 MW |
| Imeson Solar | Solar | 10.0 MW |
| Trail Ridge Landfill Gas Recovery | Biomass | 9.6 MW |
| Baptist Medical Center | Natural Gas | 9.0 MW |
| Anheuser-Busch Jacksonville | Natural Gas | 8.7 MW |
| AEP Jacksonville Solar Project | Solar | 7.1 MW |
| Starratt Solar | Solar | 5.0 MW |
| Hecate Energy Blair Road LLC | Solar | 4.0 MW |
| Old Plank Road Solar Farm, LLC | Solar | 3.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.