Data Centers in Dallas County, TX

25 data centers are mapped in Dallas County, Texas: 32 buildings covering about 81.7 acres (3,559,000 sq ft) of roof. Operators include Digital Realty, DataBank, Lumen Technologies, CoreSpace. The county is in EPA's Texas (ERCOT) grid region, whose electricity is 50% natural gas, 23% wind and 13% coal, at 733 lb of CO₂ per megawatt-hour.

Sites25mapped data centers
Buildings32mapped footprints
Roof area82 acbuilding footprints
GridERCOTlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Dallas County

Data centerOperatorCityRoof area
NTT data center, RichardsonNTTRichardson16 ac
Digital Realty data center, GarlandDigital RealtyGarland10 ac
QTS Irving - Dallas Data Center CampusQuality Technology ServicesIrving10 ac
Stream Data Centers DFWAStream Data CentersGarland6.4 ac
Equinix InfomartEquinixDallas5.5 ac
Digital Realty Dallas DFW18Digital RealtyRichardson5.1 ac
Digital Realty Dallas DFW29Digital RealtyRichardson4.2 ac
Prime DFW01-01PrimeDallas3.2 ac
Digital Realty Dallas DFW28Digital RealtyRichardson2.8 ac
Digital Realty Dallas DFW35Digital RealtyRichardson2.7 ac
Rackspace Richardson DFW3RackspaceRichardson2.6 ac
Digital Realty Dallas DFW16Digital RealtyRichardson2.5 ac
Digital Realty Dallas DFW17Digital RealtyRichardson1.9 ac
Lumen Dallas - 3180 Irving Blvd.Lumen TechnologiesDallas1.8 ac
TierPoint Dallas Data CenterTierPointDallas1.6 ac
DataBank Dallas Empire Central Data CenterDataBankDallas1.5 ac
Live Oak Data CenterOperator not recordedDallas1.1 ac
DataBank data center, DallasDataBankDallas1.0 ac
CoreSpace DallasCoreSpaceDallas0.7 ac
Lumen Dallas 6Lumen TechnologiesDallas0.3 ac
VIRTBIZOperator not recordedDallas—
Flexential Dallas - Downtown DallasFlexentialDallas—
Rad Web HostingOperator not recordedDallas—
DFW2-DC1 Project under constructionOperator not recordedWilmer—
Data center, Lancaster under constructionOperator not recordedLancaster—

What the grid here generates

Data centers in Dallas County draw from the regional grid. In 2023, electricity in EPA's Texas (ERCOT) region was 50% natural gas, 23% wind, 13% coal and 9% nuclear, at 733 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Dallas County

UtilityTypeGridBusiness rateIndustrial rate
Farmers Electric Coop, Inc - (TX)CooperativeERCOT10.9¢6.2¢
Trinity Valley Elec Coop IncCooperativeERCOT11.0¢5.8¢
City of Garland - (TX)MunicipalERCOT12.4¢6.6¢
HILCO Electric Cooperative, Inc.CooperativeERCOT14.5¢9.8¢

Utilities that report serving Dallas County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Dallas County

PlantFuelCapacity
Lake HubbardNatural Gas928 MW
Mountain CreekNatural Gas852 MW
Anole Energy StorageBattery Storage240 MW
State Farm Insur Support Center CentralOil10.8 MW
SMT Dallas BESSBattery Storage10.0 MW
SMT Dallas III BESSBattery Storage10.0 MW
Ameresco Dallas LLCBiomass4.2 MW
Verizon Hidden Ridge Solar ProjectSolar2.9 MW
TX Sunnyvale 367 Long Creek Road SolarSolar2.0 MW
OTHERBenEKDallasNatural Gas1.6 MW
Wal896Natural Gas1.2 MW
Wal2667Natural Gas1.2 MW
Wal3224Natural Gas1.2 MW
Wal3285Natural Gas1.2 MW
Wal3406Natural Gas1.2 MW

All power plants in Dallas County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me