25 data centers are mapped in Dallas County, Texas: 32 buildings covering about 81.7 acres (3,559,000 sq ft) of roof. Operators include Digital Realty, DataBank, Lumen Technologies, CoreSpace. The county is in EPA's Texas (ERCOT) grid region, whose electricity is 50% natural gas, 23% wind and 13% coal, at 733 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| NTT data center, Richardson | Richardson | 16 ac |
| Digital Realty data center, Garland | Garland | 10 ac |
| QTS Irving - Dallas Data Center Campus | Irving | 10 ac |
| Stream Data Centers DFWA | Garland | 6.4 ac |
| Equinix Infomart | Dallas | 5.5 ac |
| Digital Realty Dallas DFW18 | Richardson | 5.1 ac |
| Digital Realty Dallas DFW29 | Richardson | 4.2 ac |
| Prime DFW01-01 | Dallas | 3.2 ac |
| Digital Realty Dallas DFW28 | Richardson | 2.8 ac |
| Digital Realty Dallas DFW35 | Richardson | 2.7 ac |
| Rackspace Richardson DFW3 | Richardson | 2.6 ac |
| Digital Realty Dallas DFW16 | Richardson | 2.5 ac |
| Digital Realty Dallas DFW17 | Richardson | 1.9 ac |
| Lumen Dallas - 3180 Irving Blvd. | Dallas | 1.8 ac |
| TierPoint Dallas Data Center | Dallas | 1.6 ac |
| DataBank Dallas Empire Central Data Center | Dallas | 1.5 ac |
| Live Oak Data Center | Dallas | 1.1 ac |
| DataBank data center, Dallas | Dallas | 1.0 ac |
| CoreSpace Dallas | Dallas | 0.7 ac |
| Lumen Dallas 6 | Dallas | 0.3 ac |
| VIRTBIZ | Dallas | — |
| Flexential Dallas - Downtown Dallas | Dallas | — |
| Rad Web Hosting | Dallas | — |
| DFW2-DC1 Project under construction | Wilmer | — |
| Data center, Lancaster under construction | Lancaster | — |
Data centers in Dallas County draw from the regional grid. In 2023, electricity in EPA's Texas (ERCOT) region was 50% natural gas, 23% wind, 13% coal and 9% nuclear, at 733 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Farmers Electric Coop, Inc - (TX) | 10.9¢ | 6.2¢ |
| Trinity Valley Elec Coop Inc | 11.0¢ | 5.8¢ |
| City of Garland - (TX) | 12.4¢ | 6.6¢ |
| HILCO Electric Cooperative, Inc. | 14.5¢ | 9.8¢ |
Utilities that report serving Dallas County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Lake Hubbard | Natural Gas | 928 MW |
| Mountain Creek | Natural Gas | 852 MW |
| Anole Energy Storage | Battery Storage | 240 MW |
| State Farm Insur Support Center Central | Oil | 10.8 MW |
| SMT Dallas BESS | Battery Storage | 10.0 MW |
| SMT Dallas III BESS | Battery Storage | 10.0 MW |
| Ameresco Dallas LLC | Biomass | 4.2 MW |
| Verizon Hidden Ridge Solar Project | Solar | 2.9 MW |
| TX Sunnyvale 367 Long Creek Road Solar | Solar | 2.0 MW |
| OTHERBenEKDallas | Natural Gas | 1.6 MW |
| Wal896 | Natural Gas | 1.2 MW |
| Wal2667 | Natural Gas | 1.2 MW |
| Wal3224 | Natural Gas | 1.2 MW |
| Wal3285 | Natural Gas | 1.2 MW |
| Wal3406 | Natural Gas | 1.2 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.