Flexential Dallas - Downtown Dallas

Flexential Dallas - Downtown Dallas is a data center in Dallas, Dallas County, Texas. Its power comes off the Texas (ERCOT) grid (ERCOT), which runs on 50% natural gas, 23% wind and 13% coal.

OperatorFlexentialas mapped
Grid CO₂733 lbper MWh, ERCT region
Nearest plant2.3 miOTHERBenEKDallas

Location

This data centerOther data centersPower plants (colored by fuel)

Address1950 North Stemmons Freeway, Dallas TX 75207
CountyDallas County, Texas
Coordinates32.80041, -96.81937
Websitewww.flexential.com/data-centers/tx/dallas/downtown-data-cen…
On OpenStreetMapnode/12112238944

What powers Flexential Dallas - Downtown Dallas

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the ERCOT grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Dallas County

UtilityTypeGridBusiness rateIndustrial rate
Farmers Electric Coop, Inc - (TX)CooperativeERCOT10.9¢6.2¢
Trinity Valley Elec Coop IncCooperativeERCOT11.0¢5.8¢
City of Garland - (TX)MunicipalERCOT12.4¢6.6¢
HILCO Electric Cooperative, Inc.CooperativeERCOT14.5¢9.8¢

Utilities that report serving Dallas County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
OTHERBenEKDallasNatural Gas1.6 MW2.3 mi
SMT Dallas III BESSBattery Storage10.0 MW3.0 mi
Wal2667Natural Gas1.2 MW7.5 mi
Mountain CreekNatural Gas852 MW8.6 mi
SMT Dallas BESSBattery Storage10.0 MW9.1 mi
Verizon Hidden Ridge Solar ProjectSolar2.9 MW9.4 mi
Wal3406Natural Gas1.2 MW11.0 mi
Liggett SwitchBattery Storage10.0 MW12.0 mi
State Farm Insur Support Center CentralOil10.8 MW12.8 mi
Wal3224Natural Gas1.2 MW13.2 mi

The largest power plant within 50 miles is Forney Energy Center, a 1,894 MW natural gas plant 19 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Equinix InfomartEquinix5.5 ac0.0 mi
Live Oak Data CenterOperator not recorded1.1 ac1.9 mi
Rad Web HostingOperator not recorded—1.9 mi
DataBank data center, DallasDataBank1.0 ac2.0 mi
TierPoint Dallas Data CenterTierPoint1.6 ac2.3 mi
VIRTBIZOperator not recorded—2.5 mi
Lumen Dallas - 3180 Irving Blvd.Lumen Technologies1.8 ac2.9 mi
CoreSpace DallasCoreSpace0.7 ac3.3 mi
DataBank Dallas Empire Central Data CenterDataBank1.5 ac3.5 mi
Lumen Dallas 6Lumen Technologies0.3 ac4.2 mi
Prime DFW01-01Prime3.2 ac4.3 mi

More

Data centers in Texas · Data centers in Dallas County · All Flexential data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me