30 data centers mapped in Nevada: 39 buildings covering about 135 acres of roof. The most are in Clark County (22). Most sit in EPA's Southwest (Arizona/New Mexico) grid region, whose electricity is 49% natural gas, 18% nuclear and 11% coal, at 703 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Data centerUnder construction
A data center draws from its regional grid, not from one plant. These are the grid regions Nevada's data centers sit in, and what those regions generate:
703 lb CO₂ per MWh, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.
631 lb CO₂ per MWh, 18% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.
Switch (18) · Flexential (2) · Verizon (2) · CenturyLink (1) · DataBank (1) · Fiberhub (1) · Google (1) · Lumen Technologies (1)
| Data center | City · County | Roof area |
|---|---|---|
| Tahoe Reno 1 | McCarran · Storey | 14 ac |
| Data center, Sparks | Sparks · Washoe | 10 ac |
| Tahoe Reno 3 | McCarran · Storey | 8.9 ac |
| Switch data center, Las Vegas | Las Vegas · Clark | 8.6 ac |
| Data center, Sparks | Sparks · Washoe | 8.2 ac |
| Data center, Sparks | Sparks · Washoe | 8.2 ac |
| Switch Las Vegas 7 | Enterprise · Clark | 7.4 ac |
| Tahoe Reno 5 | McCarran · Storey | 7.0 ac |
| Tahoe Reno 4 | McCarran · Storey | 7.0 ac |
| Tahoe Reno 2 | McCarran · Storey | 6.8 ac |
| Switch Las Vegas 9 | Las Vegas · Clark | 6.5 ac |
| Google data center, Henderson | Henderson · Clark | 6.5 ac |
| Switch Las Vegas 8 | Las Vegas · Clark | 6.0 ac |
| Switch Las Vegas 15 | Las Vegas · Clark | 5.5 ac |
| Switch Las Vegas 11 | Las Vegas · Clark | 5.3 ac |
| Switch Las Vegas 14 | Las Vegas · Clark | 5.1 ac |
| Switch Las Vegas 10 | Las Vegas · Clark | 4.7 ac |
| Flexential Las Vegas - North | North Las Vegas · Clark | 2.5 ac |
| Switch Las Vegas 16 | Las Vegas · Clark | 1.4 ac |
| DataBank Las Vegas LAS1 | Las Vegas · Clark | 1.3 ac |
| Switch Las Vegas 4 | Las Vegas · Clark | 0.6 ac |
| Switch Edge 1 | Las Vegas · Clark | 0.6 ac |
| Verizon data center, Las Vegas | Las Vegas · Clark | 0.6 ac |
| Verizon North Las Vegas | North Las Vegas · Clark | 0.6 ac |
| Switch Las Vegas 5 | Las Vegas · Clark | 0.3 ac |
| CenturyLink data center, Las Vegas | Las Vegas · Clark | 0.3 ac |
| Flexential Las Vegas - Downtown | Las Vegas · Clark | 0.0 ac |
| Fiberhub LAS1 | Las Vegas · Clark | — |
| CenturyLink | Las Vegas · Clark | — |
| Switch Las Vegas 12 | Las Vegas · Clark | — |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.