20 Switch data centers are mapped in the U.S. on OpenStreetMap, in 3 states: 23 buildings covering about 118 acres (5,148,000 sq ft) of roof. Weighted by building size, the grids they sit on average 698 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Data centerUnder construction
| Grid region | Sites | CO₂ lb/MWh |
|---|---|---|
| Southwest (Arizona/New Mexico) | 13 | 703 |
| Northwest | 5 | 631 |
| Southeast | 1 | 840 |
| Texas (ERCOT) | 1 | 733 |
| Data center | Place | Roof area |
|---|---|---|
| The Keep | Lithia Springs, Georgia | 18 ac |
| Tahoe Reno 1 | McCarran, Nevada | 14 ac |
| Tahoe Reno 3 | McCarran, Nevada | 8.9 ac |
| Switch data center, Las Vegas | Las Vegas, Nevada | 8.6 ac |
| Switch Las Vegas 7 | Enterprise, Nevada | 7.4 ac |
| Tahoe Reno 5 | McCarran, Nevada | 7.0 ac |
| Tahoe Reno 4 | McCarran, Nevada | 7.0 ac |
| Tahoe Reno 2 | McCarran, Nevada | 6.8 ac |
| Switch Las Vegas 9 | Las Vegas, Nevada | 6.5 ac |
| Switch Las Vegas 8 | Las Vegas, Nevada | 6.0 ac |
| Switch Las Vegas 15 | Las Vegas, Nevada | 5.5 ac |
| Switch Las Vegas 11 | Las Vegas, Nevada | 5.3 ac |
| Switch Las Vegas 14 | Las Vegas, Nevada | 5.1 ac |
| Switch Las Vegas 10 | Las Vegas, Nevada | 4.7 ac |
| Switch Las Vegas 16 | Las Vegas, Nevada | 1.4 ac |
| Switch Las Vegas 4 | Las Vegas, Nevada | 0.6 ac |
| Switch Edge 1 | Las Vegas, Nevada | 0.6 ac |
| Switch Las Vegas 5 | Las Vegas, Nevada | 0.3 ac |
| Switch Las Vegas 12 | Las Vegas, Nevada | — |
| Switch: The Rock | Round Rock, Texas | 4.0 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.