Switch Las Vegas 7

Switch Las Vegas 7 is a data center in Enterprise, Clark County, Nevada. It is mapped as 1 building covering about 7.4 acres (323,000 sq ft). Its power comes off the Southwest (Arizona/New Mexico) grid (NV Energy), which runs on 49% natural gas, 18% nuclear and 11% coal.

OperatorSwitchas mapped
Roof area7.4 ac1 building
Grid CO₂703 lbper MWh, AZNM region
Nearest plant2.7 miSolar Las Vegas MB-1

Location

This data centerOther data centersPower plants (colored by fuel)

Address7135 South Decatur Boulevard, Enterprise NV 89118
CountyClark County, Nevada
Coordinates36.05998, -115.21000
On OpenStreetMapway/172739953

What powers Switch Las Vegas 7

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Southwest (Arizona/New Mexico) grid region, and the county's largest utility is on the NV Energy grid. In 2023, the region's electricity was 49% natural gas, 18% nuclear, 11% coal and 8% solar.

Each megawatt-hour carried about 703 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 49%Nuclear 18%Coal 11%Solar 8%Wind 8%Geothermal 4%Hydroelectric 3%

Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.

Utilities that serve Clark County

UtilityTypeGridBusiness rateIndustrial rate
Nevada Power CoInvestor OwnedNV Energy10.8¢10.1¢
Valley Electric Assn, IncCooperativeNV Energy14.0¢11.2¢
Overton Power District No 5Political SubdivisionNV Energy9.8¢11.2¢
City of Boulder City - (NV)MunicipalWestern Area Power Administration - Desert Southwest Region12.9¢12.9¢
Colorado River Comm of NevadaStateNV Energy——
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region2.5¢—

Utilities that report serving Clark County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Solar Las Vegas MB-1Solar4.9 MW2.7 mi
Solar Las Vegas MB 2, LLCSolar1.5 MW2.7 mi
Dignity - San MartinSolar1.7 MW3.5 mi
CityCenter Central Plant Cogen UnitsNatural Gas8.6 MW3.5 mi
IKEA Las Vegas 462Solar1.0 MW4.0 mi
Dignity - Siena CampusSolar1.4 MW6.5 mi
Igs Las1Solar1.0 MW7.3 mi
Clark (NVE)Natural Gas1,376 MW9.1 mi
Speedway North Bldg 1-sllas701Solar1.0 MW11.0 mi
Las Vegas WPCF Solar PlantSolar3.3 MW11.0 mi

The largest power plant within 50 miles is Chuck Lenzie Generating Station, a 1,466 MW natural gas plant 28 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Switch Las Vegas 12Switch—0.1 mi
Switch Edge 1Switch0.6 ac0.2 mi
Switch data center, Las VegasSwitch8.6 ac0.2 mi
Switch Las Vegas 8Switch6.0 ac0.3 mi
Switch Las Vegas 11Switch5.3 ac0.4 mi
Switch Las Vegas 9Switch6.5 ac0.6 mi
Switch Las Vegas 16Switch1.4 ac0.6 mi
Switch Las Vegas 15Switch5.5 ac0.7 mi
Switch Las Vegas 14Switch5.1 ac0.8 mi
Switch Las Vegas 10Switch4.7 ac0.8 mi
DataBank Las Vegas LAS1DataBank1.3 ac3.5 mi
Fiberhub LAS1Fiberhub—4.0 mi

More

Data centers in Nevada · Data centers in Clark County · All Switch data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me