IKEA Las Vegas 462 is a solar power plant in Nevada with a nameplate capacity of 1.0 MW. It generates roughly 1.4k MWh per year — enough to power about 133 average U.S. homes.
Its capacity factor of 16% reflects intermittent or peaking operation.
Run flat out every hour of the year, IKEA Las Vegas 462 could make 8.8k MWh. In 2023 it made 1.4k MWh — the same as running at full power 16 hours in every 100.
Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 6500 IKEA Way |
|---|---|
| City | Las Vegas |
| County | Clark County |
| State | Nevada |
| ZIP | 89148 |
| Coordinates | 36.06893, -115.28082 |
| Operator | IKEA Property Inc |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| PV | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2016 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Nevada Power Company |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Switch Las Vegas 14 | 3.3 mi |
| Switch Las Vegas 15 | 3.3 mi |
| Switch Las Vegas 10 | 3.4 mi |
| Switch Las Vegas 16 | 3.5 mi |
| Switch Las Vegas 9 | 3.5 mi |
| Switch Las Vegas 8 | 3.8 mi |
| Switch data center, Las Vegas | 3.8 mi |
| Switch Las Vegas 11 | 3.8 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map