22 data centers are mapped in Clark County, Nevada: 23 buildings covering about 64.1 acres (2,793,000 sq ft) of roof. Operators include Switch, Flexential, Verizon, CenturyLink. The county is in EPA's Southwest (Arizona/New Mexico) grid region, whose electricity is 49% natural gas, 18% nuclear and 11% coal, at 703 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Switch data center, Las Vegas | Las Vegas | 8.6 ac |
| Switch Las Vegas 7 | Enterprise | 7.4 ac |
| Switch Las Vegas 9 | Las Vegas | 6.5 ac |
| Google data center, Henderson | Henderson | 6.5 ac |
| Switch Las Vegas 8 | Las Vegas | 6.0 ac |
| Switch Las Vegas 15 | Las Vegas | 5.5 ac |
| Switch Las Vegas 11 | Las Vegas | 5.3 ac |
| Switch Las Vegas 14 | Las Vegas | 5.1 ac |
| Switch Las Vegas 10 | Las Vegas | 4.7 ac |
| Flexential Las Vegas - North | North Las Vegas | 2.5 ac |
| Switch Las Vegas 16 | Las Vegas | 1.4 ac |
| DataBank Las Vegas LAS1 | Las Vegas | 1.3 ac |
| Switch Las Vegas 4 | Las Vegas | 0.6 ac |
| Switch Edge 1 | Las Vegas | 0.6 ac |
| Verizon data center, Las Vegas | Las Vegas | 0.6 ac |
| Verizon North Las Vegas | North Las Vegas | 0.6 ac |
| Switch Las Vegas 5 | Las Vegas | 0.3 ac |
| CenturyLink data center, Las Vegas | Las Vegas | 0.3 ac |
| Flexential Las Vegas - Downtown | Las Vegas | 0.0 ac |
| Fiberhub LAS1 | Las Vegas | — |
| CenturyLink | Las Vegas | — |
| Switch Las Vegas 12 | Las Vegas | — |
Data centers in Clark County draw from the regional grid. In 2023, electricity in EPA's Southwest (Arizona/New Mexico) region was 49% natural gas, 18% nuclear, 11% coal and 8% solar, at 703 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Nevada Power Co | 10.8¢ | 10.1¢ |
| Valley Electric Assn, Inc | 14.0¢ | 11.2¢ |
| Overton Power District No 5 | 9.8¢ | 11.2¢ |
| City of Boulder City - (NV) | 12.9¢ | 12.9¢ |
| Colorado River Comm of Nevada | — | — |
| WAPA-- Western Area Power Administration | 2.5¢ | — |
Utilities that report serving Clark County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Chuck Lenzie Generating Station | Natural Gas | 1,466 MW |
| Clark (NVE) | Natural Gas | 1,376 MW |
| Silverhawk | Natural Gas | 1,120 MW |
| Gemini Solar Hybrid | Solar | 1,070 MW |
| Hoover Dam (NV) | Hydroelectric | 1,039 MW |
| Harry Allen | Natural Gas | 745 MW |
| Higgins Generating Station | Natural Gas | 688 MW |
| Apex Generating Station | Natural Gas | 601 MW |
| Desert Star Energy Center | Natural Gas | 537 MW |
| Las Vegas Generating Station | Natural Gas | 359 MW |
| Eagle Shadow Mountain Solar Farm | Solar | 300 MW |
| Silver Peak | Battery Storage | 279 MW |
| Arrow Canyon Solar Hybrid | Solar | 275 MW |
| Townsite Solar Project Hybrid | Solar | 270 MW |
| Silver State Solar Power South | Solar | 260 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.