Data Centers in Clark County, NV

22 data centers are mapped in Clark County, Nevada: 23 buildings covering about 64.1 acres (2,793,000 sq ft) of roof. Operators include Switch, Flexential, Verizon, CenturyLink. The county is in EPA's Southwest (Arizona/New Mexico) grid region, whose electricity is 49% natural gas, 18% nuclear and 11% coal, at 703 lb of CO₂ per megawatt-hour.

Sites22mapped data centers
Buildings23mapped footprints
Roof area64 acbuilding footprints
GridNV Energylargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Clark County

Data centerOperatorCityRoof area
Switch data center, Las VegasSwitchLas Vegas8.6 ac
Switch Las Vegas 7SwitchEnterprise7.4 ac
Switch Las Vegas 9SwitchLas Vegas6.5 ac
Google data center, HendersonGoogleHenderson6.5 ac
Switch Las Vegas 8SwitchLas Vegas6.0 ac
Switch Las Vegas 15SwitchLas Vegas5.5 ac
Switch Las Vegas 11SwitchLas Vegas5.3 ac
Switch Las Vegas 14SwitchLas Vegas5.1 ac
Switch Las Vegas 10SwitchLas Vegas4.7 ac
Flexential Las Vegas - NorthFlexentialNorth Las Vegas2.5 ac
Switch Las Vegas 16SwitchLas Vegas1.4 ac
DataBank Las Vegas LAS1DataBankLas Vegas1.3 ac
Switch Las Vegas 4SwitchLas Vegas0.6 ac
Switch Edge 1SwitchLas Vegas0.6 ac
Verizon data center, Las VegasVerizonLas Vegas0.6 ac
Verizon North Las VegasVerizonNorth Las Vegas0.6 ac
Switch Las Vegas 5SwitchLas Vegas0.3 ac
CenturyLink data center, Las VegasCenturyLinkLas Vegas0.3 ac
Flexential Las Vegas - DowntownFlexentialLas Vegas0.0 ac
Fiberhub LAS1FiberhubLas Vegas—
CenturyLinkLumen TechnologiesLas Vegas—
Switch Las Vegas 12SwitchLas Vegas—

What the grid here generates

Data centers in Clark County draw from the regional grid. In 2023, electricity in EPA's Southwest (Arizona/New Mexico) region was 49% natural gas, 18% nuclear, 11% coal and 8% solar, at 703 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 49%Nuclear 18%Coal 11%Solar 8%Wind 8%Geothermal 4%Hydroelectric 3%

Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.

Utilities that serve Clark County

UtilityTypeGridBusiness rateIndustrial rate
Nevada Power CoInvestor OwnedNV Energy10.8¢10.1¢
Valley Electric Assn, IncCooperativeNV Energy14.0¢11.2¢
Overton Power District No 5Political SubdivisionNV Energy9.8¢11.2¢
City of Boulder City - (NV)MunicipalWestern Area Power Administration - Desert Southwest Region12.9¢12.9¢
Colorado River Comm of NevadaStateNV Energy——
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region2.5¢—

Utilities that report serving Clark County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Clark County

PlantFuelCapacity
Chuck Lenzie Generating StationNatural Gas1,466 MW
Clark (NVE)Natural Gas1,376 MW
SilverhawkNatural Gas1,120 MW
Gemini Solar HybridSolar1,070 MW
Hoover Dam (NV)Hydroelectric1,039 MW
Harry AllenNatural Gas745 MW
Higgins Generating StationNatural Gas688 MW
Apex Generating StationNatural Gas601 MW
Desert Star Energy CenterNatural Gas537 MW
Las Vegas Generating StationNatural Gas359 MW
Eagle Shadow Mountain Solar FarmSolar300 MW
Silver PeakBattery Storage279 MW
Arrow Canyon Solar HybridSolar275 MW
Townsite Solar Project HybridSolar270 MW
Silver State Solar Power SouthSolar260 MW

All power plants in Clark County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me