Arrow Canyon Solar Hybrid

☀ SolarIPP Non-CHP275 MW capacity

14th largest plant in Nevada · 1144th nationally

Arrow Canyon Solar Hybrid is a solar power plant in Nevada with a nameplate capacity of 275 MW. It generates roughly 630.2k MWh per year — enough to power about 60,017 average U.S. homes.

Its capacity factor of 26% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%26%
Peaking — intermittent or backup
Capacity275 MWnameplate
Annual Generation630.2k MWhEPA eGRID
Capacity Factor26%of theoretical max
Annual CO₂metric tons

Location

Plant NameArrow Canyon Solar Hybrid
OperatorArrow Canyon Solar Llc
CityMoapa
CountyClark County
StateNevada
ZIP89025
Coordinates36.45926, -114.84439

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Generators (2)

IDTechnologyFuelCapacityStatusOnline
1Solar PhotovoltaicSolar200 MWOperating2023
2BatteriesBattery75.0 MWOperating2023

Grid context

NERC RegionWECC
Balancing AuthorityNevada Power Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Clark County