Silver Peak

🔋 Battery StorageIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameSilver Peak
OperatorSilver Peak Solar, Llc
CityBoulder City
CountyClark County
StateNevada
ZIP89005
Coordinates35.83108, -114.99245

Generators (3)

IDTechnologyFuelCapacityStatusOnline
SP3BatteriesBattery110 MWUnder Construction
SP2BatteriesBattery109 MWUnder Construction
SP1BatteriesBattery60.0 MWUnder Construction

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

What this means

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.