Igs Las1

☀ SolarIPP Non-CHP1 MW capacity

109th largest plant in Nevada · 12726th nationally

Igs Las1 is a solar power plant in Nevada with a nameplate capacity of 1.0 MW. It generates roughly 1.0k MWh per year — enough to power about 96 average U.S. homes.

Its capacity factor of 12% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%12%
Peaking — intermittent or backup
Capacity1 MWnameplate
Annual Generation1.0k MWhEPA eGRID
Capacity Factor12%of theoretical max
Annual CO₂metric tons

Location

Plant NameIgs Las1
OperatorGreenbacker Renewable Energy Corporation
CityHenderson
CountyClark County
StateNevada
ZIP89044
Coordinates35.96778, -115.14679

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
459Solar PhotovoltaicSolar1.0 MWOperating2023

Grid context

NERC RegionWECC
Balancing AuthorityNevada Power Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Clark County

View all plants in Clark County →