Dignity - Siena Campus

☀ SolarIPP Non-CHP1 MW capacity

108th largest plant in Nevada · 12057th nationally

Dignity - Siena Campus is a solar power plant in Nevada with a nameplate capacity of 1.4 MW. It generates roughly 2.9k MWh per year — enough to power about 274 average U.S. homes.

Its capacity factor of 23% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%23%
Peaking — intermittent or backup
Capacity1 MWnameplate
Annual Generation2.9k MWhEPA eGRID
Capacity Factor23%of theoretical max
Annual CO₂metric tons

Location

Plant NameDignity - Siena Campus
OperatorMn8 Energy Llc
CityHenderson
CountyClark County
StateNevada
ZIP89052
Coordinates36.00429, -115.11531

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PV1Solar PhotovoltaicSolar1.4 MWOperating2018

Grid context

NERC RegionWECC
Balancing AuthorityNevada Power Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Clark County

View all plants in Clark County →

Explore more