Dignity - Siena Campus is a solar power plant in Nevada with a nameplate capacity of 1.4 MW. It generates roughly 2.9k MWh per year — enough to power about 274 average U.S. homes.
Its capacity factor of 23% reflects intermittent or peaking operation.
Run flat out every hour of the year, Dignity - Siena Campus could make 12.3k MWh. In 2023 it made 2.9k MWh — the same as running at full power 23 hours in every 100.
Peaking or variableCapacity factor 23%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 3001 St. Rose Parkway |
|---|---|
| City | Henderson |
| County | Clark County |
| State | Nevada |
| ZIP | 89052 |
| Coordinates | 36.00429, -115.11531 |
| Operator | MN8 Energy LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | Solar | 1.4 MW | Operating | 2018 |
| Owner | Location | Share |
|---|---|---|
| Live Oak Banking Company | Wilmington, NC | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | WECC |
|---|---|
| Balancing Authority | Nevada Power Company |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| DataBank Las Vegas LAS1 | 4.2 mi |
| Fiberhub LAS1 | 4.5 mi |
| Switch Las Vegas 12 | 6.5 mi |
| Switch Las Vegas 7 | 6.5 mi |
| Switch Las Vegas 11 | 6.6 mi |
| Switch Las Vegas 8 | 6.7 mi |
| Switch Edge 1 | 6.7 mi |
| Switch data center, Las Vegas | 6.8 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map