Data Centers in Mississippi

5 data centers mapped in Mississippi: 10 buildings covering about 63 acres of roof. The most are in Madison County (4). Most sit in EPA's Mississippi Valley grid region, whose electricity is 65% natural gas, 22% nuclear and 8% coal, at 739 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Sites5mapped data centers
Buildings10mapped footprints
Roof area63 acbuilding footprints
Counties2with a data center

Map of data centers in Mississippi

Data centerUnder construction

What powers Mississippi's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Mississippi's data centers sit in, and what those regions generate:

Mississippi Valley · 4 sites

739 lb CO₂ per MWh, close to the U.S. grid as a whole (765 lb).

Natural Gas 65%Nuclear 22%Coal 8%

Share of electricity generated in EPA's Mississippi Valley grid region (SRMV) in 2023, from eGRID. 176 TWh from 161 plants.

Tennessee Valley · 1 site

895 lb CO₂ per MWh, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Nuclear 33%Natural Gas 30%Coal 28%Hydroelectric 8%

Share of electricity generated in EPA's Tennessee Valley grid region (SRTV) in 2023, from eGRID. 210 TWh from 171 plants.

All power plants in Mississippi →

By county

Operators

Amazon Web Services (1) · xAI (1)

Every mapped data center in Mississippi

Data centerOperatorCity · CountyRoof area
Amazon Web Services data center, TougalooAmazon Web ServicesTougaloo · Madison20 ac
xAI MacrohardrrxAIMemphis · DeSoto19 ac
Data center, Sharon under constructionOperator not recordedSharon · Madison9.8 ac
Data center, Sharon under constructionOperator not recordedSharon · Madison9.8 ac
Data center, Sharon under constructionOperator not recordedSharon · Madison5.0 ac

3 sites are tagged as under construction.

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me