14 data centers mapped in Maryland: 14 buildings covering about 10 acres of roof. The most are in Baltimore (city) (7). Most sit in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).
Data centerUnder construction
A data center draws from its regional grid, not from one plant. These are the grid regions Maryland's data centers sit in, and what those regions generate:
594 lb CO₂ per MWh, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
911 lb CO₂ per MWh, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.
AiNET (2) · Expedient (2) · Crown Castle Fiber (1) · Lincoln Rackhouse (1) · Lumen Technologies (1) · TierPoint (1)
| Data center | City · County | Roof area |
|---|---|---|
| Lincoln Rackhouse Maryland | Silver Spring · Montgomery | 3.3 ac |
| Data center, 9800 South Eternal Rings Drive, Laurel | Laurel · Howard | 2.6 ac |
| Data center, Frederick | Frederick · Frederick | 1.5 ac |
| Data center, 6050 Race Road, Elkridge | Elkridge · Howard | 0.8 ac |
| TierPoint Baltimore BWI | Linthicum Heights · Anne Arundel | 0.8 ac |
| Baltimore Technology Park | Baltimore · Baltimore | 0.7 ac |
| Johns Hopkins Data Center | Baltimore · Baltimore | 0.1 ac |
| CyberNAP Glen Burnie | Glen Burnie · Anne Arundel | — |
| Crown Castle Baltimore | Baltimore · Baltimore | — |
| AiNET One Market Center | Baltimore · Baltimore | — |
| Expedient Owings Mills | Owings Mills · Baltimore | — |
| Lumen Baltimore | Baltimore · Baltimore | — |
| Expedient Tidepoint | Baltimore · Baltimore | — |
| Data center, 11700 Montgomery Road, Beltsville | Beltsville · Prince George's | — |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.