2 data centers are mapped in Howard County, Maryland: 2 buildings covering about 3.4 acres (148,000 sq ft) of roof. The county is in EPA's Mid-Atlantic grid region, whose electricity is 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Data center, 9800 South Eternal Rings Drive, Laurel | Laurel | 2.6 ac |
| Data center, 6050 Race Road, Elkridge | Elkridge | 0.8 ac |
Data centers in Howard County draw from the regional grid. In 2023, electricity in EPA's Mid-Atlantic region was 54% natural gas, 36% nuclear and 5% coal, at 594 lb of CO₂ per megawatt-hour, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Baltimore Gas & Electric Co | 16.2¢ | 14.9¢ |
| The Potomac Edison Company | 13.6¢ | 13.0¢ |
Utilities that report serving Howard County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Old Court Rd Solar | Solar | 2.0 MW |
| KDC Solar TC Little Patuxent WWTP LLC | Solar | 2.0 MW |
| KDC Solar TC George Howard LLC | Solar | 2.0 MW |
| KDC Solar TC Blandair Park LLC | Solar | 2.0 MW |
| Friendship I | Solar | 2.0 MW |
| Friendship II | Solar | 2.0 MW |
| KDC Solar CV Ascend One LLC | Solar | 2.0 MW |
| KDC Solar CV Cedar Lane Park LLC | Solar | 2.0 MW |
| KDC Solar CV Central MD Regional Transit | Solar | 2.0 MW |
| KDC Solar CV Animal Control LLC | Solar | 2.0 MW |
| KDC Solar CV O'Donnell Property LLC | Solar | 2.0 MW |
| Ten Oaks | Solar | 2.0 MW |
| Chaberton Solar Catherine | Solar | 2.0 MW |
| Chaberton Solar Lime Kiln | Solar | 2.0 MW |
| Tpe MD Ho93 | Solar | 2.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.