Kdc Solar Cv Ascend One Llc is a solar power plant in Maryland with a nameplate capacity of 2.0 MW. It generates roughly 761 MWh per year — enough to power about 72 average U.S. homes.

Its capacity factor of 4% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%4%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation761 MWhEPA eGRID
Capacity Factor4%of theoretical max
Annual CO₂metric tons

Location

Plant NameKdc Solar Cv Ascend One Llc
OperatorKdc Solar Cv Ascend One Llc
CityWest Friendship
CountyHoward County
StateMaryland
ZIP21794
Coordinates39.31771, -76.98454

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
CVAOSolar PhotovoltaicSolar2.0 MWOperating2023

Grid context

NERC RegionRFC
Balancing AuthorityPjm Interconnection, Llc