Data center, 11700 Montgomery Road, Beltsville is a data center in Beltsville, Prince George's County, Maryland. Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.

OperatorOperator not recordedas mapped
Grid CO₂594 lbper MWh, RFCE region
Nearest plant2.2 miIKEA College Park 411

Location

This data centerOther data centersPower plants (colored by fuel)

Address11700 Montgomery Road, Beltsville MD 20705
CountyPrince George's County, Maryland
Coordinates39.05284, -76.92592
On OpenStreetMaprelation/20381848

What powers Data center, 11700 Montgomery Road, Beltsville

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.

Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 54%Nuclear 36%Coal 5%

Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.

Utilities that serve Prince George's County

UtilityTypeGridBusiness rateIndustrial rate
Baltimore Gas & Electric CoInvestor OwnedPJM Interconnection16.2¢14.9¢
Potomac Electric Power CoInvestor OwnedPJM Interconnection14.8¢22.7¢
Southern Maryland Elec Coop IncCooperativePJM Interconnection12.6¢—

Utilities that report serving Prince George's County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
IKEA College Park 411Solar2.0 MW2.2 mi
GWCC PV Solar FarmSolar1.6 MW2.6 mi
Central Utility Plant at White OakNatural Gas54.3 MW3.2 mi
Mo32 (CSG)Solar2.0 MW4.9 mi
Chaberton Solar Lime KilnSolar2.0 MW6.7 mi
Spectrum Solar HybridSolar5.6 MW7.2 mi
7185 13th Pl. NWSolar0.9 MW7.7 mi
Brookville Smart Bus Depot MicrogridSolar5.0 MW8.0 mi
Igs CC, LLCSolar1.5 MW8.4 mi
CUA West Campus - South (CSG)Solar2.8 MW9.1 mi

The largest power plant within 50 miles is Chalk Point Power, a 1,825 MW natural gas plant 37 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Lincoln Rackhouse MarylandLincoln Rackhouse3.3 ac2.1 mi

More

Data centers in Maryland · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me