Ikea College Park 411

☀ SolarCommercial Non-CHP2 MW capacity

78th largest plant in Maryland · 10231st nationally

Ikea College Park 411 is a solar power plant in Maryland with a nameplate capacity of 2.0 MW. It generates roughly 2.3k MWh per year — enough to power about 216 average U.S. homes.

Its capacity factor of 13% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%13%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation2.3k MWhEPA eGRID
Capacity Factor13%of theoretical max
Annual CO₂metric tons

Location

Plant NameIkea College Park 411
OperatorIkea Property Inc
CityCollege Park
CountyPrince Georges County
StateMaryland
ZIP20740
Coordinates39.02100, -76.92600

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolar

Generators (2)

IDTechnologyFuelCapacityStatusOnline
IKEASolar PhotovoltaicSolar1.0 MWOperating2021
PVSolar PhotovoltaicSolar1.0 MWOperating2012

Grid context

NERC RegionRFC
Balancing AuthorityPjm Interconnection, Llc

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Prince Georges County

View all plants in Prince Georges County →

Explore more