Baltimore Technology Park is a data center in Baltimore, Baltimore (city), Maryland. It is mapped as 1 building covering about 30,000 sq ft. Its power comes off the Mid-Atlantic grid (PJM Interconnection), which runs on 54% natural gas, 36% nuclear and 5% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 1401 Russell Street, Baltimore MD 21230 |
|---|---|
| County | Baltimore (city), Maryland |
| Coordinates | 39.27529, -76.62562 |
| On OpenStreetMap | way/336387583 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Atlantic grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 54% natural gas, 36% nuclear and 5% coal.
Each megawatt-hour carried about 594 lb of CO₂, 22% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Atlantic grid region (RFCE) in 2023, from eGRID. 286 TWh from 815 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Baltimore Gas & Electric Co | 16.2¢ | 14.9¢ |
Utilities that report serving Baltimore (city) to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Wheelabrator Baltimore Refuse | Biomass | 64.5 MW | 0.7 mi |
| Inner Harbor East Heating | Natural Gas | 2.1 MW | 1.5 mi |
| Domino Sugar Baltimore | Natural Gas | 17.5 MW | 1.6 mi |
| Philadelphia | Oil | 82.8 MW | 3.7 mi |
| MD Baltimore 4851 Holabird Ave | Solar | 1.8 MW | 3.9 mi |
| CPG - Duke 5300B Holabird | Solar | 1.5 MW | 4.0 mi |
| CPG - Duke 5300A Holabird | Solar | 1.5 MW | 4.0 mi |
| IGS Solar I - BWI5 | Solar | 1.1 MW | 4.2 mi |
| IGS Solar I - BWI2 | Solar | 1.4 MW | 4.2 mi |
| CPG - Duke 5900 Holabird | Solar | 1.5 MW | 4.3 mi |
The largest power plant within 50 miles is Peach Bottom, a 2,876 MW nuclear plant 38 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Lumen Baltimore | — | 1.2 mi |
| AiNET One Market Center | — | 1.2 mi |
| Crown Castle Baltimore | — | 1.3 mi |
| Expedient Tidepoint | — | 1.8 mi |
| Johns Hopkins Data Center | 0.1 ac | 4.2 mi |
Data centers in Maryland · Data centers in Baltimore (city) · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.