Meta data center, Cedar Valley

Meta data center, Cedar Valley is a data center in Cedar Valley, Utah County, Utah. It is mapped as 5 buildings covering about 52.2 acres (2,275,000 sq ft). Its power comes off the Northwest grid (PacifiCorp East), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorMetaas mapped
Roof area52 ac5 buildings
Grid CO₂631 lbper MWh, NWPP region
Nearest plant12.6 miFaraday Solar

Location

This data centerOther data centersPower plants (colored by fuel)

CountyUtah County, Utah
Coordinates40.26855, -112.01630
On OpenStreetMapway/1024051963, way/1024051997, way/1035123473, way/1473440674, way/1473440676

What powers Meta data center, Cedar Valley

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the PacifiCorp East grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Utah County

UtilityTypeGridBusiness rateIndustrial rate
PacifiCorpInvestor OwnedPacifiCorp East9.2¢7.8¢
Provo City CorpMunicipalPacifiCorp East9.3¢6.7¢
Lehi City CorporationMunicipalPacifiCorp East11.1¢—
Spanish Fork City CorporationMunicipalPacifiCorp East9.4¢6.7¢
City of Springville - (UT)MunicipalPacifiCorp East11.6¢8.9¢
Strawberry Electric Serv DistPolitical SubdivisionPacifiCorp East16.0¢13.1¢

Utilities that report serving Utah County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Faraday SolarSolar525 MW12.6 mi
Faraday Energy StorageBattery Storage150 MW13.2 mi
Lake Side Power PlantNatural Gas1,247 MW14.5 mi
Swire Coca-Cola DraperSolar3.7 MW18.5 mi
Provo Power PlantNatural Gas12.0 MW18.7 mi
BYU Central Heating PlantNatural Gas16.5 MW19.6 mi
Trans-Jordan Generating StationBiomass4.8 MW19.6 mi
PaysonNatural Gas19.6 MW20.8 mi
Nebo Power StationNatural Gas140 MW20.8 mi
Copperton Solar Plant No. 1Solar30.0 MW21.6 mi

The largest power plant within 50 miles is Lake Side Power Plant, a 1,247 MW natural gas plant 14 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Utah · Data centers in Utah County · All Meta data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me