17 data centers mapped in Utah: 22 buildings covering about 72 acres of roof. The most are in Salt Lake County (12). Most sit in EPA's Northwest grid region, whose electricity is 39% hydroelectric, 25% natural gas and 16% coal, at 631 lb of CO₂ per megawatt-hour, 18% cleaner than the U.S. grid as a whole (765 lb).
Data centerUnder construction
A data center draws from its regional grid, not from one plant. These are the grid regions Utah's data centers sit in, and what those regions generate:
631 lb CO₂ per MWh, 18% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.
DataBank (5) · Flexential (5) · Lumen Technologies (1) · Meta (1) · ValorC3 (1) · Verizon (1)
| Data center | City · County | Roof area |
|---|---|---|
| Meta data center, Cedar Valley | Cedar Valley · Utah | 52 ac |
| eBay | Bingham Canyon · Salt Lake | 7.5 ac |
| DataBank SLC6 | Bluffdale · Salt Lake | 2.1 ac |
| DataBank SLC5 | Bluffdale · Salt Lake | 2.1 ac |
| DataBank SLC3 | Bluffdale · Salt Lake | 1.9 ac |
| DataBank SLC2 | Bluffdale · Salt Lake | 1.6 ac |
| Flexential Salt Lake City - Downtown | Salt Lake City · Salt Lake | 1.4 ac |
| Flexential Salt Lake City - South Valley | West Jordan · Salt Lake | 0.7 ac |
| DataBank SLC4 | Bluffdale · Salt Lake | 0.7 ac |
| Flexential Salt Lake City - Millcreek | Salt Lake City · Salt Lake | 0.6 ac |
| Verizon data center, Sandy City | Sandy City · Salt Lake | 0.4 ac |
| Strata Networks | Vernal · Uintah | 0.3 ac |
| Flexential Salt Lake City - Fair Park | Salt Lake City · Salt Lake | 0.3 ac |
| FiberState Datacenter | Draper · Salt Lake | 0.2 ac |
| Lumen | Saint George · Washington | 0.0 ac |
| Flexential Salt Lake City - Lindon | Lindon · Utah | — |
| ValorC3 data center, Saint George | Saint George · Washington | — |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.