Flexential Salt Lake City - Fair Park is a data center in Salt Lake City, Salt Lake County, Utah. It is mapped as 1 building covering about 12,500 sq ft. Its power comes off the Northwest grid (PacifiCorp East), which runs on 39% hydroelectric, 25% natural gas and 16% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 118 South 1000 West, Salt Lake City UT 84104 |
|---|---|
| County | Salt Lake County, Utah |
| Coordinates | 40.76685, -111.92022 |
| Website | www.flexential.com/data-centers/ut/salt-lake-city/fair-park… |
| On OpenStreetMap | way/1121188409 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the PacifiCorp East grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.
Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| PacifiCorp | 9.2¢ | 7.8¢ |
| City of Murray - (UT) | 7.9¢ | 6.0¢ |
| WAPA-- Western Area Power Administration | 3.4¢ | 3.1¢ |
Utilities that report serving Salt Lake County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Gadsby | Natural Gas | 433 MW | 0.5 mi |
| Salt Palace Solar Gen Plant | Solar | 1.3 MW | 1.3 mi |
| Tesoro SLC Cogeneration Plant | Natural Gas | 30.4 MW | 2.0 mi |
| HTW Plant 303 COGEN | Natural Gas | 7.4 MW | 4.1 mi |
| Dominguez Energy Storage | Battery Storage | 200 MW | 4.5 mi |
| Salt Lake Energy Systems | Biomass | 3.2 MW | 6.1 mi |
| Murray Turbine | Natural Gas | 42.0 MW | 6.9 mi |
| Bountiful City | Natural Gas | 30.4 MW | 8.5 mi |
| West Valley Generation Project | Natural Gas | 217 MW | 9.1 mi |
| Kennecott Power Plant | Other Fossil | 38.2 MW | 11.2 mi |
The largest power plant within 50 miles is Lake Side Power Plant, a 1,247 MW natural gas plant 31 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Flexential Salt Lake City - Downtown | 1.4 ac | 1.9 mi |
Data centers in Utah · Data centers in Salt Lake County · All Flexential data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.