FiberState Datacenter

FiberState Datacenter is a data center in Draper, Salt Lake County, Utah. It is mapped as 1 building covering about 10,400 sq ft. Its power comes off the Northwest grid (PacifiCorp East), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorOperator not recordedas mapped
Roof area0.2 ac1 building
Grid CO₂631 lbper MWh, NWPP region
Nearest plant0.9 miSwire Coca-Cola Draper

Location

This data centerOther data centersPower plants (colored by fuel)

CountySalt Lake County, Utah
Coordinates40.51149, -111.88828
Websitewww.fiberstate.com/datacenters
On OpenStreetMapway/1133047980

What powers FiberState Datacenter

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the PacifiCorp East grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Salt Lake County

UtilityTypeGridBusiness rateIndustrial rate
PacifiCorpInvestor OwnedPacifiCorp East9.2¢7.8¢
City of Murray - (UT)MunicipalPacifiCorp East7.9¢6.0¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region3.4¢3.1¢

Utilities that report serving Salt Lake County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Swire Coca-Cola DraperSolar3.7 MW0.9 mi
Little CottonwoodHydroelectric4.8 MW6.8 mi
GraniteHydroelectric2.0 MW9.3 mi
Trans-Jordan Generating StationBiomass4.8 MW9.6 mi
StairsHydroelectric1.0 MW10.5 mi
Murray TurbineNatural Gas42.0 MW10.9 mi
Copperton Solar Plant No. 1Solar30.0 MW11.2 mi
West Valley Generation ProjectNatural Gas217 MW13.1 mi
Snowbird Power PlantNatural Gas6.5 MW13.3 mi
Lake Side Power PlantNatural Gas1,247 MW14.3 mi

The largest power plant within 50 miles is Lake Side Power Plant, a 1,247 MW natural gas plant 14 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
DataBank SLC5DataBank2.1 ac2.2 mi
DataBank SLC4DataBank0.7 ac2.3 mi
DataBank SLC6DataBank2.1 ac2.4 mi
DataBank SLC2DataBank1.6 ac2.4 mi
DataBank SLC3DataBank1.9 ac2.4 mi

More

Data centers in Utah · Data centers in Salt Lake County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me