Data Centers in Indiana

10 data centers mapped in Indiana: 15 buildings covering about 39 acres of roof. The most are in St. Joseph County (3). Most sit in EPA's Ohio Valley grid region, whose electricity is 38% natural gas, 28% nuclear and 25% coal, at 911 lb of CO₂ per megawatt-hour, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Sites10mapped data centers
Buildings15mapped footprints
Roof area39 acbuilding footprints
Counties6with a data center

Map of data centers in Indiana

Data centerUnder construction

What powers Indiana's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Indiana's data centers sit in, and what those regions generate:

Ohio Valley · 10 sites

911 lb CO₂ per MWh, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

All power plants in Indiana →

By county

Operators

Amazon (1) · DartPoints (1) · Digital Crossroad (1) · Indiana University (1) · Verizon Wireless (1)

Every mapped data center in Indiana

Data centerOperatorCity · CountyRoof area
Data center, New CarlisleOperator not recordedNew Carlisle · St. Joseph19 ac
Data center, New CarlisleOperator not recordedNew Carlisle · St. Joseph14 ac
Digital Crossroad data center, HammondDigital CrossroadHammond · Lake2.6 ac
IU Data CenterIndiana UniversityBloomington · Monroe2.2 ac
Verizon Wireless data center, 7510 West Stinemyer Road, New PalestineVerizon WirelessNew Palestine · Hancock0.5 ac
Data center, ColumbusOperator not recordedColumbus · Bartholomew0.1 ac
DartPoints ColumbusDartPointsColumbus · Bartholomew—
Amazon AWS Data CenterAmazonNew Carlisle · St. Joseph—
Learning GIS!Operator not recordedWest Lafayette · Tippecanoe—
Agricultural and Biological EngineeringOperator not recordedWest Lafayette · Tippecanoe—

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me