Data center, New Carlisle is a data center in New Carlisle, St. Joseph County, Indiana. It is mapped as 3 buildings covering about 14.4 acres (627,000 sq ft). Its power comes off the Ohio Valley grid (MISO (Midcontinent ISO)), which runs on 38% natural gas, 28% nuclear and 25% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | St. Joseph County, Indiana |
|---|---|
| Coordinates | 41.69220, -86.46513 |
| On OpenStreetMap | way/1471517733, way/1471517736, way/1471517737 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.
Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Northern Indiana Pub Serv Co | 16.8¢ | 6.3¢ |
| Indiana Michigan Power Co | 11.9¢ | 8.4¢ |
| City of Mishawaka | 10.9¢ | — |
| Kankakee Valley Rural E M C | 15.4¢ | 11.1¢ |
| Midwest Energy Cooperative - (MI) | 17.4¢ | — |
Utilities that report serving St. Joseph County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| St Joseph Energy Center | Natural Gas | 780 MW | 0.9 mi |
| OlivePV | Solar | 5.0 MW | 1.4 mi |
| Honeysuckle Solar Farm | Solar | 150 MW | 1.9 mi |
| Southeast Berrien Generating Facility | Biomass | 4.8 MW | 10.8 mi |
| Notre Dame Hydro | Hydroelectric | 2.5 MW | 11.4 mi |
| Buchanan (MI) | Hydroelectric | 4.4 MW | 11.8 mi |
| University of Notre Dame | Natural Gas | 39.6 MW | 11.8 mi |
| French Paper Hydro | Hydroelectric | 1.3 MW | 13.8 mi |
| Walkerton | Solar | 1.1 MW | 16.4 mi |
| Indeck Niles Energy Center | Natural Gas | 1,174 MW | 17.2 mi |
The largest power plant within 50 miles is Donald C Cook, a 2,285 MW nuclear plant 20 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Data center, New Carlisle | 19 ac | 0.4 mi |
| Amazon AWS Data Center | — | 1.7 mi |
Data centers in Indiana · Data centers in St. Joseph County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.