Data Centers in Bartholomew County, IN

2 data centers are mapped in Bartholomew County, Indiana: 2 buildings covering about 2,500 sq ft of roof. Operators include DartPoints. The county is in EPA's Ohio Valley grid region, whose electricity is 38% natural gas, 28% nuclear and 25% coal, at 911 lb of CO₂ per megawatt-hour.

Sites2mapped data centers
Buildings2mapped footprints
Roof area0.1 acbuilding footprints
GridMISO (Midcontinent ISO)largest utility's grid

Map

Data centerUnder construction

Data centers in Bartholomew County

Data centerOperatorCityRoof area
Data center, ColumbusOperator not recordedColumbus0.1 ac
DartPoints ColumbusDartPointsColumbus—

What the grid here generates

Data centers in Bartholomew County draw from the regional grid. In 2023, electricity in EPA's Ohio Valley region was 38% natural gas, 28% nuclear, 25% coal and 5% wind, at 911 lb of CO₂ per megawatt-hour, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Bartholomew County

UtilityTypeGridBusiness rateIndustrial rate
Duke Energy Indiana, LLCInvestor OwnedMISO (Midcontinent ISO)9.9¢7.9¢
AES IndianaInvestor OwnedMISO (Midcontinent ISO)14.3¢10.2¢
Jackson County Rural E M C - (IN)CooperativeMISO (Midcontinent ISO)13.3¢10.5¢
RushShelby EnergyCooperativeMISO (Midcontinent ISO)13.6¢8.5¢
Bartholomew County Rural E M CCooperativeMISO (Midcontinent ISO)13.2¢9.4¢
Decatur County Rural E M CCooperativeMISO (Midcontinent ISO)12.5¢8.9¢

Utilities that report serving Bartholomew County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me