Verizon Wireless Data Centers

5 Verizon Wireless data centers are mapped in the U.S. on OpenStreetMap, in 5 states: 5 buildings covering about 6.0 acres (260,000 sq ft) of roof. Weighted by building size, the grids they sit on average 797 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Sites5mapped
States5with a site
Buildings5mapped footprints
Roof area6.0 acbuilding footprints

Map of Verizon Wireless data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Michigan196249% natural gas, 25% coal and 10% nuclear
Upper Midwest192038% wind, 35% coal and 13% natural gas
Tennessee Valley189533% nuclear, 30% natural gas and 28% coal
Texas (ERCOT)173350% natural gas, 23% wind and 13% coal
Ohio Valley191138% natural gas, 28% nuclear and 25% coal

Every mapped site

Data centerPlaceGrid regionRoof area
Verizon Wireless data center, 7510 West Stinemyer Road, New PalestineNew Palestine, IndianaOhio Valley0.5 ac
DTRT.PP2Detroit, MichiganMichigan0.6 ac
Verizon Wireless data center, 4002 South 149th Circle, OmahaOmaha, NebraskaUpper Midwest0.9 ac
Verizon Wireless data center, Whites CreekWhites Creek, TennesseeTennessee Valley—
Verizon Wireless Mew BuildingSouthlake, TexasTexas (ERCOT)4.0 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me