Verizon Wireless data center, 7510 West Stinemyer Road, New Palestine

Verizon Wireless data center, 7510 West Stinemyer Road, New Palestine is a data center in New Palestine, Hancock County, Indiana. It is mapped as 1 building covering about 20,900 sq ft. Its power comes off the Ohio Valley grid (MISO (Midcontinent ISO)), which runs on 38% natural gas, 28% nuclear and 25% coal.

OperatorVerizon Wirelessas mapped
Roof area0.5 ac1 building
Grid CO₂911 lbper MWh, RFCW region
Nearest plant4.4 miIndy Solar I, LLC

Location

This data centerOther data centersPower plants (colored by fuel)

Address7510 West Stinemyer Road, New Palestine IN 46163
CountyHancock County, Indiana
Coordinates39.71716, -85.94144
On OpenStreetMapway/349925359

What powers Verizon Wireless data center, 7510 West Stinemyer Road, New Palestine

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.

Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Hancock County

UtilityTypeGridBusiness rateIndustrial rate
Duke Energy Indiana, LLCInvestor OwnedMISO (Midcontinent ISO)9.9¢7.9¢
AES IndianaInvestor OwnedMISO (Midcontinent ISO)14.3¢10.2¢
NineStar ConnectCooperativeMISO (Midcontinent ISO)13.7¢12.6¢
RushShelby EnergyCooperativeMISO (Midcontinent ISO)13.6¢8.5¢
City of Greenfield - (IN)MunicipalMISO (Midcontinent ISO)12.4¢10.6¢

Utilities that report serving Hancock County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Indy Solar I, LLCSolar10.0 MW4.4 mi
Indy Solar II, LLCSolar10.1 MW4.4 mi
Lenape IISolar4.0 MW6.8 mi
Greenfield Solar ParkSolar2.8 MW8.5 mi
M. G. Emmett J. Bean Federal CenterSolar1.9 MW10.2 mi
CC Perry KNatural Gas5.0 MW12.4 mi
POET Biorefining - ShelbyvilleNatural Gas6.1 MW12.6 mi
Lilly Technical CenterOil5.0 MW13.0 mi
Covanta Indianapolis EnergyBiomass6.5 MW13.2 mi
BelmontSolar3.8 MW13.4 mi

The largest power plant within 50 miles is Harding Street, a 1,065 MW natural gas plant 14 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Indiana · All Verizon Wireless data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me